| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 12709/P001/C.
Reason: To identify the approved plan/s and to avoid doubt. |
3)
Notwithstanding the provisions of Part 1, Class A of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building(s) hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the external appearance of the building/s in the interests of the amenities of the area. (Section 7, NPPF) |
4)
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no windows shall be inserted into the north east, south east and north west elevations of the proposed dwelling without the grant of further specific planning permission from the Local Planning Authority.
Reason: To protect the privacy of neighbouring residents. (Section 7, NPPF) |
5)
No development shall take place, notwithstanding the details submitted with the application, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality. (Section 7, NPPF) |
6)
A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme [before the use hereby permitted is commenced / before the building(s) is/are occupied] and be thereafter retained.
Reason: To safeguard the appearance of the completed development and the visual amenities of the locality. (Section 7, NPPF) |
7)
Development shall not begin until details of the junction of the proposed vehicular access with the highway have been approved by the Local Planning Authority and no building shall be occupied until the junction has been constructed in accordance with the approved details.
Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises. |
8)
Before the access is first brought into use, a triangular vision splay shall be provided on each side of the new access drive and shall be 2.8m measured along the back edge of the highway from the centre line of the anticipated vehicle path to a point 2.0m measured from the back edge of the foot way into the site along the centre line of the anticipated vehicle path. The vision splay sod described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.
Reason: To provide adequate visibility between the existing highway and the proposed access and to make the access safe and convenient to the traffic which is likely to use it. (Section 4, NPPF) |
9)
The proposed driveway shall be constructed and surfaced in a stable and durable manner in accordance with details to be approved in writing by the Local Planning Authority for a minimum distance of 5m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
Reason: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of the highway. |
10)
Details of a refuse collection point located outside of the public highway shall be submitted to and approved in writing by the Local Planning Authority prior to the occupation of the dwelling and retained thereafter.
Reason: In the interest of amenity and in order to minimise danger , obstruction and inconvenience to users of the highway and the premises. |
11)
The development hereby permitted shall not be brought into use until a scheme for the parking of cycles on the site has been submitted to and approved in writing by the Local Planning Authority. The scheme shall be fully implemented before the development is [first occupied/brought into use] and thereafter retained for this purpose.
Reason: To ensure the provision of cycle parking to meet the needs of occupiers of the proposed development in the interests of encouraging the use of sustainable modes of transport. (Section 4, NPPF) |
12)
No development shall take place until details of the existing and final ground and slab levels of the buildings hereby approved have been submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties, the location of which shall first be agreed in writing with the Local Planning Authority. Thereafter the site shall be developed in full accordance with the approved details.
Reason: To ensure that an acceptable relationship results between the new development and adjacent buildings and public areas. (Section 7, NPPF) |
|
|---|