<< Back to case
Conditions or Reasons for Planning Application - CB/18/00065/FULL
Conditions or Reasons:
1) The dwellinghouse hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the adjacent buildings.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match the existing building in the interests of the visual amenities of the locality.
(Policy BE8 SBLPR & Section 7, NPPF)
2) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order) the opening in the front elevation of the car port shall be retained and shall not be enclosed or infilled without the express permission of the Local Planning Authority and the car port accommodation on the site shall not be used for any purpose, other than as car port accommodation, unless permission has been granted by the Local Planning Authority on an application made for that purpose.

Reason: To ensure that parked vehicles do not adversely affect the safety and convenience of road users by causing obstruction and by overhanging the adjoining public highway and to retain off-street parking provision and thereby minimise the potential for on-street parking which could adversely affect the convenience of road users.
(Policy T10, SBLPR and Section 4, NPPF).
3) Prior to occupation details of the junction of the proposed vehicular access with the highway have been approved by the Local Planning Authority and constructed in accordance with the approved details.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
(Section 4, NPPF)
4) Vision splays shall be provided on each side of the access drive and shall be 2.8m measured along the back edge of the new highway from the centre line of the anticipated vehicle path to a point 2.0m measured from the back edge of the footway into the site along the centre line of the anticipated vehicle path. The vision splay so described and on land under the dwelling occupier's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.

Reason: To provide adequate visibility between the new estate road and the new individual accesses, and to make the accesses safe and convenient for the traffic which is likely to use them.
(Section 4, NPPF)
5) Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: In order to minimise danger, obstruction, and inconvenience to users of the highway and of the premises.
(Section 4, NPPF)
6) Notwithstanding the provisions of Part 1, Classes B and C of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no additions or alterations to the roofs of the dwellings hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.

Reason: To control the external appearance of the buildings in the interests of the amenities of the area and to protect privacy to neighbouring properties.
(Policy BE8, SBLPR and Section 7, NPPF)
7) Prior to the occupation of any dwelling on the site, a scheme for the provision of waste receptacles for each dwelling shall be submitted to and agreed in writing by the Local Planning Authority. The receptacles shall be provided before first occupation takes place.

Reason: In the interest of residential amenity and to reduce waste generation in accordance with the Councils's Minerals and Waste Local Plan 2014, Policy WSP5 and the adopted SPD "Managing Waste in New Developments" (2006).
8) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers Site Location Plan, 401 Rev A, 402, 403 and 404.

Reason: To identify the approved plans and to avoid doubt.


Return to Search | Close WindowTop of Page