| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
Notwithstanding the provisions of the Town and Country Planning General Permitted Development Order 2015, or any amendments thereto, any garage accommodation hereby approved on the site shall not be used for any purpose, other than as garage accommodation, unless permission has been granted by the Local Planning Authority on an application made for that purpose.
Reason: To retain off-street parking provision and thereby minimise the potential for on-street parking which could adversely affect the convenience of road users. (Policy DM3 of the Core Strategy for the North and Section 4 of the NPPF) |
3)
Notwithstanding the provisions of Part 1, Class A & Class B of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to the buildings hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the external appearance of the building/s in the interests of the amenities of the area and in the interest of ensuring appropriate on plot parking provision. (Policy DM3 of the Core Strategy for the North and Sections 4 & 7, NPPF) |
4)
Notwithstanding the provisions of Part 1 Class E of Schedule 2 to the Town and Country (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no buildings or other structures shall be erected or constructed within the curtilage of the property without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the development in the interests of the visual amenity of the area. (Section 7, NPPF) |
5)
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no fences, gates, walls or other means of enclosure shall be erected within the curtilage of the property without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the development in the interests of the rural amenity of the area. (Section 7, NPPF) |
6)
The development shall not be occupied or brought into use until the parking, turning areas, road and footpaths shown on Drawing No. 001 Rev B has been completed. The scheme shall thereafter be retained for this purpose.
Reason: To ensure provision for car parking clear of the highway and appropriate accessibility. (Policy DM3 of the Core Strategy for the North and Section 4, NPPF) |
7)
The development hereby permitted shall not be commenced until a detailed surface water drainage design has been submitted to, and approved in writing by, the local planning authority. The design shall be fully implemented and subsequently maintained, in accordance with the timing / phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the local planning authority. The scheme to be submitted shall include: Plans and calculations showing sufficient disposal, storage and conveyance of surface water. Details of who the surface water drainage will be managed by and how it will be maintained
Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and prevent the increased risk of flooding both on and off site for the lifetime of the development in accordance with para 103 NPPF; and to ensure that the implementation and long term operation of a sustainable drainage system (SuDS) is in line with what has been approved, in accordance with Written statement - HCWS161, in accordance with section 10 of the NPPF. |
8)
No development shall take place shall take place until a Landscape Maintenance and Management Plan for a period of ten years from the date of its delivery in accordance with Condition 9 has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the management body, who will be responsible for delivering the approved landscape maintenance and management plan. The landscaping shall be maintained and managed in accordance with the approved plan following its delivery in accordance with Condition 9.
Reason: To ensure that the appearance of the site would be acceptable in accordance with Policy DM14 of the Core Strategy and Sections 10 & 11 of the NPPF. |
9)
No development shall take place until details of hard and soft landscaping (which shall include the 3 metre landscape buffer along the edge of the site), together with a timetable for its implementation have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out as approved and in accordance with the approved timetable.
Reason: To ensure an acceptable standard of landscaping. (Policy DM14 of the Core Strategy for the North and Sections 7 & 11, NPPF) |
10)
Prior to occupation, the details of the proposed street lighting in terms of design & specification, siting and luminance shall be submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with the approved plans and shall thereafter be retained.
Reason: To ensure the acceptable design and appearance of the development and in the interest of future occupiers amenity. (Policy DM3 of the Core Strategy and Section 7 of the NPPF) |
11)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers SLP001 Rev B (Site Location Plan), PL001 Rev B (Proposed Site Layout), PL002 (Plot 7), PL003 (Plots 8 & 9), 28193/53 Rev P3 (Proposed External Works), PL004 (Proposed Street Elevations), PL005 (Proposed Street Sections) & PL013 (Garages Plots 7 & 8).
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|