<< Back to case
Conditions or Reasons for Planning Application - CB/18/01430/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the existing building.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match the existing building in the interests of the visual amenities of the locality in accordance with policy DM3 of the Core Strategy and Development Management Policies (2009) and Section 7, NPPF.
3) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no windows shall be inserted into the northwest flank elevation of the proposed part single storey extension, without the grant of further specific planning permission from the Local Planning Authority.

Reason: To protect the privacy of neighbouring residents in accordance with policy DM3 of the Core Strategy and Development Management Policies (2009) and Section 7, NPPF.
4) Nothwithstanding the submitted plans, the first floor bathroom window in the side (southeast) elevation of the existing dwelling shall be permanently fitted with obscured glass of a type to substantially restrict vision through it at all times and shall be non-opening, unless the parts of the window which can be opened are more than 1.7m above the floor of the room in which the window is installed.

Reason: To safeguard the privacy of occupiers of adjoining properties in accordance with policy DM3 of the Core Strategy and Development Management Policies (2009) and Section 7, NPPF.
5) The development hereby approved shall not be brought into use until all on site vehicular areas as shown on drg entitled 'Proposed car parking arrangements version 7.0' has been laid out and surfaced in stable and durable materials (not loose aggregate) and provision has been made for the interception and drainage of surface water from the site to soak away within the site so that it does not discharge into the highway or into the main drainage system and those areas shall not thereafter be used for any other purpose.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and to ensure satisfactory parking of vehicles outside highway limits in accordance with Policy DM3 of the Core Strategy and Development Management Policies (2009).
6) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers: OS site location plan, block plan, existing & proposed floor & roof plans version 5.0, existing & proposed elevations version 6.0, proposed car parking arrangements version 7.0.

Reason: To identify the approved plan/s and to avoid doubt.


Return to Search | Close WindowTop of Page