| Conditions or Reasons for Planning Application - CB/18/02183/FULL |
| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
The first floor windows serving a bedroom and a bathroom in the east facing side elevation of Plot 3 and the first floor window serving a bedroom in the east facing side elevation of Plot4 hereby permitted shall be permanently fitted with obscured glass of a type to substantially restrict vision through it at all times and shall be non-opening, unless the parts of the window(s) which can be opened are more than 1.7m above the floor of the rooms in which the windows is installed.
Reason: To safeguard the privacy of occupiers of adjoining properties (Section 12, NPPF) |
3)
Notwithstanding the provisions of Part 1, Class A of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to the Plot 3 hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the external appearance of the building/s in the interests of the amenities of the area. (Section 12, NPPF) |
4)
The planting and landscaping scheme shown on approved Drawing No.2917-L3A shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season shall mean the period from October to March). The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season with others of a similar size and species.
Reason: To ensure an acceptable standard of landscaping. (Sections 12 & 15, NPPF) |
5)
No dwelling hereby permitted shall be first occupied until the existing vehicle access has been reconstructed and all on site areas have been surfaced in tarmacadam or similar durable, porous but bound material and arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
Reason: To avoid the carriage of extraneous material or surface water from the site into the highway so as to safeguard the interests of highway safety, in accordance with Policy DM3 of the Core Strategy and Development Management Policies (2009). |
6)
The boundary treatment shall be completed in accordance with the approved Drawing No.2917-L3A before the buildings are occupied and be thereafter retained.
Reason: To safeguard the appearance of the completed development and the visual amenities of the locality. (Section 12, NPPF) |
7)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 2917-L3A, 2917-B3C, 2917-B2D, 2917-B5A, 2917-B6, 2917-B4 and 2917-B1C.
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|