| Conditions or Reasons for Planning Application - CB/18/02234/FULL |
| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those outlined on plan No. 118-P2A, 118-P6A, 118-P1C and 188-P5.
Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match the existing building in the interests of the visual amenities of the locality. (Section 12, NPPF) |
3)
Prior to the installation of any additional fixed plant, machinery or equipment, a scheme shall be submitted for approval to the Local Planning Authority to demonstrate that the rating level of sound emitted from such shall not exceed a level 5dB(A) below the existing background sound levels at any sound sensitive premises. All measurements shall be made in accordance with the methodology of BS4142 (2014) (Method for rating and assessing industrial and commercial sound) and/or its subsequent amendments.
Reason: For the protection of neighbouring amenity. (Section 12, NPPF). |
4)
No additional means of kitchen ventilation or air extraction shall be installed without prior written consent by the local authority.
Reason: For the protection of neighbouring amenity (Section 12, NPPF) |
5)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 118-L3B, 118-P6A, 118-P1C, 118-P7A, 118-P2A, 118-L1A, 118-S1, 118-P5
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|