| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
Full details of both hard and soft landscaping shall be submitted to and approved in writing by the Local Planning Authority. These details shall include:-
proposed finished levels or contours; materials to be used for any hard surfacing; planting plans, including schedule of size, species, positions, density and times of planting; cultivation details including operations required to establish new planting; details of existing trees and hedgerows on the site, indicating those to be retained and the method of their protection during development works.
The development shall be carried out in accordance with the approved details.
Reason: In order to ensure that the landscaping is carried out within a reasonable period in the interest of the visual amenities of the area. |
3)
The scheme approved in Condition 2 shall be carried out by a date which shall be not later than the end of the full planting season immediately following the completion of the development. Thereafter the planting shall be adequately maintained for a period of five years from the date of planting. Any of the trees or shrubs or both which die or are removed, or which become severely damaged or seriously diseased (during the said period of five years) shall be replaced with trees or shrubs or both, as the case may be, of similar size and species to those originally required to be planted and the same shall be maintained until properly established.
Reason: In order to ensure that the planting is carried out within a reasonable period in the interest of the visual amenities of the area. |
4)
A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme [before the use hereby permitted is commenced / before the building(s) is/are occupied] and be thereafter retained.
Reason: To safeguard the appearance of the completed development and the visual amenities of the locality. (Section 7, NPPF) |
5)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, number LB/0091.
Reason: To identify the approved plan/s and to avoid doubt. |
6)
No development shall take place, notwithstanding the details submitted with the application, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality. (Section 7, NPPF) |
7)
Any gates provided shall open away from the highway and be set back a distance of at least 8.0m from the near side edge of the carriageway of the adjoining highway and be free of obstruction of vehicular access ot the turning area for vehicles using the site.
Reason: To enable vehicles to draw off the highway before the gates are opened and turn and leave in forward gear. |
8)
Before the premises are occupied all on site vehicular areas shall be surfaced in stable and durable materials in accordance with details to be approved in writing by the Local Planning Authority. Arrangements shall be made for surface water drainage from the site to soak away within the site so that it does not discharge into the highway or into the main drainage system.
Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure satisfactory parking of vehicles outside highway limits. |
9)
Prior to occupation, the proposed development shall be carried out and completed in all respects in accordance with the access, siting and layout, vehicular and cycle parking provision, turning area and refuse collection point illustrated on the approved drawing no. LB/0091/F and defined by this permission and, notwithstanding the provisions of the Town and Country Planning General Permitted development Order 2015, (or any Order revoking or re-enacting that Order) there shal be no variation without the prior approval in writing of the Local Planning Authority,
Reason: To ensure that the development of the site is completed insofar as its various parts are interrelated and dependant one upon another and to provide adequate and appropriate access arrangements at all times. |
|
|---|