| Conditions or Reasons for Planning Application - CB/18/02449/FULL |
| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
No development shall take place, notwithstanding the details submitted with the application, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality. (Section 12, NPPF) |
3)
A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme [before the use hereby permitted is commenced / before the building(s) is/are occupied] and be thereafter retained.
Reason: To safeguard the appearance of the completed development and the visual amenities of the locality. (Section 12, NPPF) |
4)
No development shall take place until details of the existing and final ground and slab levels of the buildings hereby approved have been submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties indicating the ridge levels of 54a and the proposed dwelling. Thereafter the site shall be developed in full accordance with the approved details.
Reason: To ensure that an acceptable relationship results between the new development and adjacent buildings and public areas. (Section 12, NPPF) |
5)
No development shall take place until a landscaping scheme to include all hard and soft landscaping and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.
Reason: To ensure an acceptable standard of landscaping. (Sections 12 & 15, NPPF) |
6)
The first floor windows in the east and south roofslopes of the development hereby permitted shall be permanently fitted with obscured glass of a type to substantially restrict vision through it at all times and shall be non-opening, unless the parts of the window(s) which can be opened are more than 1.7m above the floor of the room(s) in which the window(s) is installed. No further windows or other openings shall be formed in the roof.
Reason: To safeguard the privacy of occupiers of adjoining properties. (Section 12, NPPF) |
7)
Prior to first occupation of the dwelling, the turning circle shown on thew approved plans to be used for the turning of vehicles upon the forecourt of the dwellinghouse shall be installed and made continually available to the occupiers of the dwelling.
Reason: To ensure the safe manoeuvering and turning of vehicles for the purpose of highway safety. (Section 12 of the NPPF and Policy DM3 of the Core Strategy and Development Management Policies (2009)) |
8)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 18025/01, 03B, 04A, 05A, 06A, 07A.
Reason: To identify the approved plans and to avoid doubt. |
|
|---|