| Conditions or Reasons: | The development hereby permitted shall be undertaken in full accordance with the Councils adopted Construction Code of Practice for Developers and Contractors https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.
Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties (Section 12, NPPF) |
1)
Application for the approval of the reserved matters shall be made to the Local Planning Authority within three years from the date of this permission. The development shall begin not later than two years from the final approval of the reserved matters or, if approved on different dates, the final approval of the last such matter to be approved.
Reason: To comply with Section 92 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
Details of the access, appearance, landscaping, layout, and scale, (hereinafter called "the reserved matters") shall be submitted to and approved in writing by the Local Planning Authority before any development takes place and the development shall be carried out in accordance with the details approved.
Reason: To comply with Part 3 Article 6 of the Town and Country Planning (General Development Procedure) Order 2015. |
3)
Prior to commencement of the development details of substantial protective fencing for the protection of any retained trees, must be submitted to and approved in writing by the Local Planning Authority. The approved fencing shall be maintained until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made.
Reason: To protect the trees so enclosed in accordance with Section 8 of BS 5837 of 2012 or as may be subsequently amended. (Sections 12 & 15, NPPF) |
4)
Prior to commencement of the development, details of the existing and final ground and slab levels of the buildings hereby approved have been submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties, the location of which shall first be agreed in writing with the Local Planning Authority. Thereafter the site shall be developed in full accordance with the approved details.
Reason: To ensure that an acceptable relationship results between the new development and adjacent buildings and public areas. (Section 12, NPPF) |
5)
No development shall take place until a written scheme of archaeological investigation, that adopts a staged approach and includes the provision for post excavation analysis and publication, has been submitted to and approved in writing by the Local Planning Authority. The development hereby approved shall only be implemented in full accordance with the approved archaeological scheme.
Reason: This condition is pre-commencement as a failure to secure appropriate archaeological investigation in advance of development would be contrary to paragraph 199 of the National Planning Policy Framework (NPPF) that requires developers to record and advance of understanding of the significance of any heritage assets to be lost (wholly or in part) as a consequence of the development. |
6)
The details required by condition 2 of this permission, shall include the following:
Vehicle parking and garaging, in accordance with the councils standards applicable at the time of submission Cycle parking and storage in accordance with the councils standards applicable at the time of submission Refuse collection points clear of the adopted public highway and any visibility splays A turning space will be required for a service/delivery sized vehicle (6.5m length) A workable area of 3.7m between boundaries will be required for a 10.05m length fire engine
Reason: To ensure that the development of the site is completed to provide adequate and appropriate highway arrangements at all times. |
7)
A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme before the building is occupied and be thereafter retained.
Reason: To safeguard the appearance of the completed development and the visual amenities of the locality. (Section 12, NPPF) |
8)
Prior to commencement of the construction of the dwelling, details of the method of disposal of foul and surface water drainage have been submitted to and agreed in writing by the Local Planning Authority, including any land drainage system. Thereafter no part of the development shall be occupied or brought into use until the approved drainage scheme has been implemented.
Reason: To ensure that adequate foul and surface water drainage is provided and that existing and future land drainage needs are protected. (Section 14, NPPF) |
9)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers Site Location Plan, Heritage Statement, CBC/001 and CBC/002.
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|