<< Back to case
Conditions or Reasons for Planning Application - CB/18/03103/RM
Conditions or Reasons:
1) The planting and soft landscaping scheme shown on approved Drawing No. BRS01 shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season shall mean the period from October to March). The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season with others of a similar size and species.

Reason: To ensure an acceptable standard of landscaping.
(Sections 12 & 15, NPPF)
2) A scheme for hard landscaping shall be submitted to the Local Planning Authority for its approval in writing and the approved scheme shall be implemented before the development is first occupied, and maintained as such thereby after.

Reason: To ensure an acceptable standard of landscaping.
(Sections 12 & 15, NPPF)
3) Prior to the occupation of the dwellinghouse, a scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme and be thereafter retained.

Reason: To safeguard the appearance of the completed development and the visual amenities of the locality.
(Section 12, NPPF)
4) No development shall take place until details of the existing and final ground and slab levels of the buildings hereby approved have been submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties, the location of which shall first be agreed in writing with the Local Planning Authority. Thereafter the site shall be developed in full accordance with the approved details.

Reason: To ensure that an acceptable relationship results between the new development and adjacent buildings and public areas.
(Section 12, NPPF)
5) Notwithstanding the provisions of Part 1 Class E of Schedule 2 to the Town and Country (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no buildings or other structures shall be erected or constructed within the curtilage of the property beyond the line of the current village envelope as defined in the Central Bedfordshire Core Strategy and Development Management Policies 2009, without the grant of further specific planning permission from the Local Planning Authority.

Reason: To control the development in the interests of the visual amenity of the area.
(Section 12, NPPF)
6) No building shall be occupied until the junction/ vehicle crossover of the proposed vehicular access with the highway has been constructed in accordance with the approved details.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
(Section 9, NPPF).
7) The proposed vehicular access shall be surfaced in bituminous or other similar durable material as may be approved in writing by the Local Planning Authority for a distance of 5.0m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety.
(Section 9, NPPF)
8) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), any garage, car port or parking space hereby permitted shall be kept permanently available for the parking of motor vehicles.

Reason: To ensure that off-street parking is retained in the interests of highway safety.
(Section 9, NPPF)
9) Prior to occupation, the proposed development shall be carried out and completed in all respects in accordance with the access siting and layout, driver/driver and driver/pedestrian visibility splays and parking layout illustrated on the approved drawing no. LD/2018-01/02 and defined by this permission and, notwithstanding the provision of the Town and Country Planning General Permitted Development Order 1995, (or any Order revoking or re-enacting that Order) there shall be no variation without the prior approval in writing of the Local Planning Authority. The vision splay so described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.

Reason: To ensure that the development of the site is completed insofar as its various parts are interrelated and dependent one upon another and to provide adequate and appropriate access arrangements at all times.
(Section 9, NPPF)
10) No development shall take place, notwithstanding the details submitted with the application, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality.
(Section 12, NPPF)
11) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers LD/2018-01/01, LD/2018-01/02, BRS01, LD/2018-01/04, LD/2018-01/05

Reason: To identify the approved plan/s and to avoid doubt.


Return to Search | Close WindowTop of Page