Conditions or Reasons for Planning Application - CB/18/03240/LB
Conditions or Reasons:
1) None of the components, members or elements comprising the structural timber frame and fabric - including the infill panel material, stave or wattle and daub or brick, stone and plaster - of the building shall be cut, damaged, altered or otherwise changed - other than those parts specifically identified within the submitted details. No sandblasting or any other abrasive cleaning shall take place.

Reason: To ensure that the special architectural or historic interest of the building or structure, its character and appearance is properly preserved, maintained and enhanced, in accordance with standard conservation good practice.
(Section 12, NPPF).
2) No windows, doors, roofs or rainwater goods shall be installed in the approved development until details of all new and proposed replacement windows and doors to a scale of 1:10 or 1:20. together with a specification of the materials and finishes - including windows, doors, roofs and rainwater goods (which shall be of cast iron and painted black unless otherwise agreed in writing by the Local Planning Authority) have been submitted to an approved in writing by the Local Planning Authority. Details provided shall clearly show a section of glazing bars, frame mouldings, door panels, the position of the door or window frame in relation to the face of the wall, the depth of the reveal and arch and sill details. The development shall be carried out only in accordance with the approved details.

Reason: To ensure that the proposed development/work is carried out in a manner that safeguards the historic character and appearance of the area.
(Section 12, NPPF).

This pre-commencement condition is necessary in order to ensure that no unnecessary harm is caused by the commencement of development works.
3) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers DD-082 Sheet 1, DD-082 Sheet 2 rev A, CBC/001 Materials Schedule.

Reason: To identify the approved plans and to avoid doubt.