<< Back to case
Conditions or Reasons for Planning Application - CB/18/04125/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers CBC/001, CBC/002, CBC/003.

Reason: To identify the approved plan/s and to avoid doubt.
3) No vehicle shall cross the footway until the access has been constructed in accordance with the approved details.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
4) The proposed driveway shall be constructed and surfaced in a stable and durable material in accordance with details to be approved in writing by the Local Planning Authority for a minimum distance of 5m into the site, measured from the highway boundary, before the premises are occupied.  Arrangement shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of the highway.
5) The maximum gradient of the vehicular access shall be 10% (1 in 10).

Reason: In the interests of the safety of persons using the access and users of the highway.
6) Before the development is first brought into use, the parking scheme shown on the approved plan shall be completed and thereafter retained for this purpose.

Reason: To ensure the provision of car parking clear of the highway.


Return to Search | Close WindowTop of Page