| Conditions or Reasons: | 1)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers PL01C, PL02A, PL03A, PL04A, PL05A, PL06A, PL07A, PL08 and 02B.
Reason: To identify the approved plan/s and to avoid doubt. |
2)
The planting, landscaping scheme shown on approved Drawing No. PL01B dated 12/03/19 shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season shall mean the period from October to March). The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season with others of a similar size and species.
Reason: To ensure an acceptable standard of landscaping. (Sections 12 & 15, NPPF) |
3)
The boundary treatment scheme shown in drawing number PL01B shall be constructed in the positions, design, materials and type shown prior to the building being occupied. The boundary treatment shall then be retained thereafter.
Reason: To safeguard the appearance of the completed development and the visual amenities of the locality. (Section 12, NPPF) |
4)
No above ground development shall take place, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality. (Section 12, NPPF) |
5)
The bin storage/collection areas hereby permitted shall be implemented in accordance with the approved details and shall be available for use prior to occupation. The bin storage/collection areas shall be retained thereafter.
Reason: In the interest of amenity. (Section 12, NPPF) |
6)
Details of signage advising heavy goods vehciles not to access No.9A, located at the point of access with the public highway, shall be submitted to and approved in writing by the Local Planning Authority and the development shall not be brought into use until the signage has been implemented in accordance with the approved details. The approved signage shall remain thereafter.
Reason: To avoid heavy goods vehicles access to no. 9A in the interest of highway safety. (Section 9, NPPF) |
7)
No building shall be occupied until the junction of the proposed vehicular access with the highway has been constructed in accordance with the approved details.
Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises. (Section 9, NPPF) |
8)
Before the premises are occupied all on site vehicular areas shall be surfaced in a stable and durable materials in accordance with details to be approved in writing by the Local Planning Authority. Arrangements shall be made for surface water drainage from the site to soak away within the site so that it does not discharge into the highway or into the main drainage system.
Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure satisfactory parking of vehicles outside highway limits. (Section 9, NPPF) |
|
|---|