| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
Notwithstanding the provisions of Part 1, Class A of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building(s) hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the external appearance of the building/s in the interests of the amenities of the area. (Section 12, NPPF) |
3)
Notwithstanding the provisions of Part 1 Class E of Schedule 2 to the Town and Country (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no buildings or other structures shall be erected or constructed within the curtilage of the property without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the development in the interests of the visual amenity of the area. (Section 12, NPPF) |
4)
A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected and the means of enclosing the bin store. The boundary treatment and bin store shall be completed in accordance with the approved scheme before the dwellings are occupied and be thereafter retained.
Reason: To safeguard the appearance of the completed development and the visual amenities of the locality. (Section 12, NPPF) |
5)
No above ground development shall take place, notwithstanding the details submitted with the application, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality. (Section 12, NPPF) |
6)
The first floor window(s) in the flank elevations of the development hereby permitted shall be permanently fitted with obscured glass of a type to substantially restrict vision through it at all times and shall be non-opening, unless the parts of the window(s) which can be opened are more than 1.7m above the floor of the room(s) in which the window(s) is installed. No further windows or other openings shall be formed in the flank elevations.
Reason: To safeguard the privacy of occupiers of adjoining properties (Section 12, NPPF) |
7)
No building shall be occupied until the junction of the proposed vehicular access with the highway has been constructed in accordance with the approved details.
Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises. (Section 9, NPPF) |
8)
The proposed driveway shall be constructed and surfaced in a stable and durable material in accordance with details to be approved in writing by the Local Planning Authority for a minimum distance of 5m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
Reason:To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of the highway. (Section 9, NPPF) |
9)
Before the development is first occupied or brought into use, the parking scheme shown on plan no 502-10- rev A shall be completed and thereafter retained for this purpose.
Reason: To ensure the provision of car parking clear of the highway. (Section 9, NPPF) |
10)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 502-01(002), 502-02 A, 502-03-A, 502-03-A, 502-10-B and 502-11-A.
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|