| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme [before the use hereby permitted is commenced / before the building(s) is/are occupied] and be thereafter retained.
Reason: To safeguard the appearance of the completed development and the visual amenities of the locality. (Section 12, NPPF) |
3)
No development shall commence until a detailed surface water drainage scheme for the site, based on the agreed Sustainable Drainage Strategy Report and assessment of the hydrological and hydrogeological context of the development, has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include provision of attenuation for the 1 in 100 year event (+40% allowance for climate change) as outlined in the approved Drainage Strategy Drawings. Any revisions to the agreed strategy shall be fully justified and approved before the development is completed and shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan. The scheme shall be implemented in accordance with the approved final details before the development is completed, and shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan.
Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with para 163 and 165 of NPPF. |
4)
No building/dwelling shall be occupied until the developer has formally submitted in writing to the Local Planning Authority a finalised 'Maintenance and Management Plan' for the entire surface water drainage system, inclusive of any adoption arrangements and/or private ownership or responsibilities, and that the approved surface water drainage scheme has been correctly and fully installed as per the final approved details.
Reason To ensure that the implementation and long term operation of a sustainable drainage system (SuDS) is in line with what has been approved, in accordance with Written Statement HCWS161. |
5)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers: 2022-0500-02, 2022-0501-01, 2022-0502-01, 2022-0503-01, 2022-0504- 01, 2022-0505-01, 2022-0506-01, 2022-0507-01, 2022-0508-01, 2022-0509-02, 2022-0203-01, 2202-0204-01, 27599/600 3, 27599/601 4, 27599/602 2
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|