Conditions or Reasons for Planning Application - CB/19/01560/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those outlined on the proposed elevation sheets numbered 1048-PL-600 P1.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match the existing building in the interests of the visual amenities of the locality.
(Section 12, NPPF)
3) No development shall take place until a landscaping scheme to include all hard and soft landscaping and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To ensure an acceptable standard of landscaping.
(Sections 12 & 15, NPPF)
4) A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme before the use hereby permitted is commenced and be thereafter retained.

Reason: To safeguard the appearance of the completed development and the visual amenities of the locality.
(Section 12, NPPF)
5) The development hereby approved shall be carried out in exact accordance with the levels and section plan submitted through CBC-004.

Reason: To ensure that an acceptable relationship results between the new development and adjacent buildings and public areas.
(Section 12, NPPF)
6) Development shall not begin until details of the improvements to the junction of the vehicular access with the highway have been approved by the Local Planning Authority and no building shall be occupied until the junction has been constructed in accordance with those approved details. Those details shall incorporate a minimum width of 4.8m along with a clearance of 300mm from any obstruction.
Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
(Section 9, NPPF)
7) The turning space for vehicles illustrated on the approved Plans (No SK06 and 1048-PL-110 Rev P1) shall be constructed before the development is first brought into use.
Reason: To enable vehicles to draw off, park and turn outside the highway limits thereby avoiding the reversing of vehicles on to the highway.
(Section 9, NPPF)
8) The width of the access road into the site for its entire length shall be no less than 4.1m with lateral clearance on either side of at least 0.15m
Reason: In the interest of road safety and for the avoidance of doubt.
(Section 9, NPPF)
9) Before the access is first brought into use a triangular vision splay shall be provided on each side of the new access and shall measure 1.8m along the fence, wall, hedge or other means of definition of the front boundary of the site, and 1.8m measured into the site at right angles to the same line along the side of the new access drive. The vision splays so described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.
Reason: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it.
(Section 9, NPPF)
10) Before the premises are occupied all on site vehicular areas shall be surfaced in a manner to the Local Planning Authority's approval so as to ensure satisfactory parking of vehicles outside highway limits. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
Reason: In order to minimise danger, obstruction, and inconvenience to users of the highway and of the premises.
(Section 9, NPPF)
11) Development shall not be brought into use until details of refuse collection point have been approved by the Local Planning Authority and no building shall be occupied until the said storage and collection points have been constructed in accordance with the approved details.
Reason: To ensure the refuse collection bins do not cause a hazard or obstruction to the highway or parking area.
(Section 9, NPPF)
12) The development hereby permitted shall be undertaken in full accordance with the Councils adopted Construction Code of Practice for Developers and Contractors https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.

Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties (Section 12, NPPF)
13) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:

SK06
CBC-001 Elevations (1)
CBC-002 Elevations (2)
CBC-003 Elevations (3)
1048-PL-110 P1
CBC-004 Levels
CBC-005 Site Location
CBC-006 Basement Floor Plans
CBC-007 Roof Plan
CBC-008 Second Floor Plan
CBC-009 First Floor Plan
CBC-010 Ground Floor Plans

Reason: To identify the approved plan/s and to avoid doubt.