Conditions or Reasons for Planning Application - CB/19/03049/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the existing building.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match the existing building in the interests of the visual amenities of the locality.
(Section 12, NPPF)
3) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers SWL/174/A1/502, SWL/174/A1/500, SWL/174/A1/501 and SWL/A1/503/A (dated 16/10/2019).
Reason: To identify the approved plan/s and to avoid doubt.
4) Before the premises are occupied all on site vehicular areas shall be surfaced in a stable and durable materials in accordance with details to be approved in
writing by the Local Planning Authority. Arrangements shall be made for surface water drainage from the site to soak away within the site so that it
does not discharge into the highway or into the main drainage system.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding
and to minimise inconvenience to users of the premises and ensure satisfactoryparking of vehicles outside highway limits
5) The first floor en suite window in the east facing elevation of the development hereby permitted shall be permanently fitted with obscured glass of a type to substantially restrict vision through it at all times and shall be non-opening, unless the parts of the window which can be opened are more than 1.7m above the floor of the room in which the window is installed. No further windows or other openings shall be formed in the first floor east facing elevation.

Reason: To safeguard the privacy of occupiers of adjoining properties
(Section 12, NPPF)