Conditions or Reasons for Planning Application - CB/19/03148/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers SU-01, PL-001-F, PL-002-A, PL-002.2-A, PL-003-A, and PL-004-A.

Reason: To identify the approved plan/s and to avoid doubt.
3) Notwithstanding the details submitted with the application, prior to commencement of above ground works, details of the materials to be used for the external walls and roofs of the development hereby approved shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality.
(Section 12, NPPF)
4) Notwithstanding the provisions of Part 1, Class A of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building(s) hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.

Reason: To control the external appearance of the building/s in the interests of the amenities of the area.
(Section 12, NPPF)
5) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no fences, gates, walls or other means of enclosure shall be erected within the curtilage of the property without the grant of further specific planning permission from the Local Planning Authority.

Reason: To control the development in the interests of the rural amenity of the area.
(Section 12, NPPF)
6) Notwithstanding the provisions of Part 1, Class B of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no addition or alteration to the roof of the building(s) hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.

Reason: To control the external appearance of the building/s in the interests of the amenities of the area, and to protect the openness of the Green Belt.
(Section 12 and 13, NPPF)
7) The landscaping scheme as per the Landscape Design Report dated January 2020 by Anna French Associates shall be implemented by the end of the full planting season immediately following the completion and/or use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall be maintained in accordance with the approved details and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To ensure an acceptable standard of landscaping.
(Sections 12 and 15, NPPF)
8) The boundary treatment as detailed in the Landscape Design Report dated January 2020 by Anna French Associates shall be implemented prior to occupation and shall thereafter be retained in perpetuity.

Reason: To ensure an acceptable standard of development.
(Sections 12 and 15, NPPF)
9) No development shall take place until an Ecological Enhancement Strategy (EES) for the creation of new wildlife features such as the inclusion of integrated bird/bat and bee boxes in buildings/structures, hedgehog holes in fences and tree, hedgerow, shrub and wildflower planting/establishment has been submitted to and approved in writing by the local planning authority. The content shall be informed by an up to date Ecological Appraisal of the site and include the:
a) purpose and objectives for the proposed works;
b) detailed design(s) and/or working method(s) necessary to achieve stated objectives (including, where relevant, type and source of materials to be used);
c) extent and location of proposed works shown on appropriate scale maps and plans;
d) timetable for implementation, demonstrating that works are aligned with the proposed phasing of construction;
e) persons responsible for implementing the works;
f) details of initial aftercare and long-term maintenance.The works shall be carried out strictly in accordance with the approved details and shall beretained in that manner thereafter.

Reason: To ensure development is ecologically sensitive and secures biodiversity enhancements in accordance with the National Planning Policy Framework.
(Section 15, NPPF)
10) No development approved by this permission shall take place until the following has been submitted to and approved in writing by the Local Planning Authority:
?? A Phase 1 Desk Study report documenting the ground conditions of the site with regard to potential contamination;
?? A Phase 2 Site Investigation (where shown as necessary the Phase 1 Desk Study);
?? A Phase 3 Remediation Scheme (where shown as necessary by the Phase 2 Site Investigation)

All such work shall be undertaken in accordance with BS:10175:2011 or other appropriate guidance issued by the regulatory authorities. The work shall be sufficient to ensure that measures will be taken to mitigate any risks to human health and the wider environment.

Reason: To protect human health and to ensure that no future investigation is required under Part 2A of the Environmental Protection Act 1990.
11) Prior to any permitted dwelling being occupied a validation report shall be submitted and approved in writing by the Local Planning Authority to demonstrate the effectiveness of any agreed Remediation Strategy. Any such validation shall include responses to any unexpected contamination discovered during works.

Reason: To protect human health and to ensure that no future investigation is required under Part 2A of the Environmental Protection Act 1990.
12) The development hereby permitted shall be undertaken in full accordance with the Councils adopted Construction Code of Practice for Developers and Contractors https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.

Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties (Section 12, NPPF)
13) Visibility splays shall be provided at all private means of access from individual properties onto the Highway. This vision splay shall be provided on each side of the access drive and shall be 2.8m measured along the back edge of the new highway from the centre line of the anticipated vehicle path to a point 2.0m measured from the back edge of the footway into the site along the centre line of the anticipated vehicle path. The vision splays so described and on land under the dwelling occupier's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.

Reason: In the interests of road safety and pedestrian movement.
(Section 9, NPPF)
14) No dwelling fronting Hill View Lane shall be occupied until a 2.0m wide footway has been constructed on the northern side of the Hill View Lane fronting the site in accordance with details of the approved drawing/or scheme to be submitted to and approved by the Local Planning Authority. Any Statutory Undertakers equipment or street furniture shall be resited to provide an unobstructed footway.

Reason: In the interests of road safety and pedestrian movement.
(Section 9, NPPF)
15) Development shall not begin until details of the improvements to the junction between the proposed parking court and the Leighton Road have been approved by the Local Planning Authority and no building shall be occupied until that junction has been constructed in accordance with the approved details.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and of the proposed estate road.
(Section 9, NPPF)
16) Visibility splays shall be provided at the junctions of the accesses with Hill View Lane before the development is brought into use. The minimum dimensions to provide the required splay lines shall be 2.0m measured along the centre line of the proposed access from its junction with the channel of the public highway and 43.0m measured from the centre line of the proposed access along the line of the channel of the Hill View Lane. The required vision splays shall, on land in the applicant's control, be kept free of any obstruction.

Reason: To provide adequate visibility between the existing highway and the proposed accesses, and to make the accesses safe and convenient for the traffic which is likely to use them.
(Section 9, NPPF)
17) Visibility splays shall be provided at junction with Leighton Road. The minimum dimensions to provide the required splay lines shall be 2.4m measured along the centre line of the side road from its junction with the channel to the through road and 43m measured from the centre line of the side road along the channel of the through road. The vision splays required shall be provided and defined on the site by or on behalf of the developers and be entirely free of any obstruction.

Reason: To provide adequate visibility at road junction in the interest of road safety.
(Section 9, NPPF)
18) Before the new access is first brought into use, any existing access within the frontage of the land to be developed, not incorporated in the access hereby approved shall be closed in a manner to the Local Planning Authority's written approval.

Reason: In the interest of road safety and to reduce the number of points at which traffic will enter and leave the public highway.
(Section 9, NPPF)
19) The maximum gradient of all vehicular accesses onto the estate roads shall be 10% (1 in 10).

Reason: In the interests of the safety of persons using the access and users of the highway.
(Section 9, NPPF)
20) Before the premises are occupied all on site vehicular areas shall be surfaced in a manner to the Local Planning Authority's approval so as to ensure satisfactory parking of vehicles outside highway limits. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: In order to minimise danger, obstruction, and inconvenience to users of the highway and of the premises.
(Section 9, NPPF)
21) Prior to occupation a scheme for the parking of cycles on the site shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be fully implemented before the development is first occupied or brought into use and thereafter retained for this purpose.

Reason: To ensure the provision of adequate cycle parking to meet the needs of occupiers of the proposed development in the interests of encouraging the use of sustainable transport modes.
(Section 9, NPPF)
22) Prior to occupation a refuse collection scheme indicating the bin storage/collection points shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be fully implemented before the development is first occupied or brought into use and thereafter retained for this purpose.

Reason: In the interest of amenity.
(Section 9, NPPF)
23) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no alterations to the carport hereby permitted, including the insertion of a garage door, roller shutter or gate, shall be carried out without the grant of further specific permission from the District Planning Authority.

Reason: To control the external appearance of the building in the interests of the highway safety of the area.
(Section 9, NPPF)
24) The development of plot 6 or 7 shall not begin unless and until highway rights have been extinguished across the area of land marked on drawing number PL001 Rev F, in accordance with a stopping up order to be made by the Secretary of State for Transport, Government Office for the East of England, under Section 247 of the Town and Country Planning Act 1990, or by application to the highway authority for the stopping up of highway land via the magistrates court under section 117 of the Highways Act 1980.

Reason: To facilitate the development and to safeguard the interests of the general public.
25) No dwelling taking access from Leighton Road shall be occupied until a 2.0m wide footway has been constructed from Hill View Lane the proposed junction of the development on Leighton Road in accordance with details of the approved drawing/or scheme to be submitted to and approved by the Local Planning Authority. Any Statutory Undertakers equipment or street furniture shall be resited to provide an unobstructed footway.

Reason: In the interests of road safety and pedestrian movement.
(Section 9, NPPF)
26) Prior to the construction of vehicular parking areas associated with the approved dwellinghouses, a scheme for the charging of electric vehicles shall be submitted to and approved in writing by the Local Planning Authority. Subsequently, the development shall be completed in accordance with these approved details.

Reason: To assist with the transition to low-emission vehicles in line with paragraph 110 of the National Planning Policy Framework (2019).
27) Prior to the occupation of any dwelling on the site, a scheme for the provision of waste receptacles for each dwelling shall be submitted to and agreed in writing by the Local Planning Authority. The receptacles shall be provided before occupation takes place.

Reason: In the interest of residential amenity and to reduce waste generation in accordance with the Councils's Minerals and Waste Local Plan 2014, Policy WSP5 and the adopted SPD "Managing Waste in New Developments" (2006).
28) A landscape management plan, setting out management and maintenance responsibilities for the amenity area sited to the north of the houses, shall be submitted to and approved by the Local Planning Authority prior to the occupation of the development. The landscape management plan shall be carried out as approved and shall remain in force for so long as the development remains in existence.

Reason: To ensure a satisfactory standard of development and to safeguard the amenities of the surrounding area and Green Belt.
(Sections 12, 13 and 15, NPPF)
29) Prior to commencement of above ground works, a scheme for protecting the proposed dwellings from noise from road traffic shall be submitted to and approved in writing by the local planning authority. The scheme shall follow the recommendations identified in the Auracle Acoustics report (Ref: 2019-09-19a) dated 19th September 2019. None of the dwellings shall be occupied until such a scheme has been implemented in accordance with the approved details, and shown to be effective, and it shall be retained in accordance with those details thereafter.

Reason: To safeguard the amenities of neighbouring residential occupiers.
(Section 15, NPPF)