<< Back to case
Conditions or Reasons for Planning Application - CB/19/03791/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the existing building.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match the existing building in the interests of the visual amenities of the locality.
(Section 12, NPPF)
3) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 9203-PL-05 rev. P2, 9203-PL-04 rev. P2, 9203-PL-03 rev. P1, 9203-PL-02 rev. P1, 9203-PL-01 rev. P1.

Reason: To identify the approved plan/s and to avoid doubt.
4) No development shall commence until a final detailed design of the surface water drainage scheme, to manage surface water runoff from the development for up to and including the 1 in 100 year event (+40%CC), has been submitted to and approved in writing by the Local Planning Authority. The approved drainage works shall be completed prior to the completion of the development. The final detailed design shall be based on the agreed DEFRAY Non-statutory technical standards for sustainable drainage systems (March, 2018), and shall be subsequently implemented and maintained as approved.

Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance to prevent the increased risk of flooding both on and off site, in accordance with paragraph 163 & 165 in the NPPF.


Return to Search | Close WindowTop of Page