Conditions or Reasons for Planning Application - CB/19/04066/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) No works above ground level, notwithstanding the details submitted with the application, shall be untaken until details of the materials to be used for the external walls and roofs of the development shall be submitted to the Local Planning Authority for approval in writing. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality, in accordance with Policies CS14 and DM3 of the adopted Local Plan, Policy HQ1 of the emerging Local Plan and the NPPF.
3) The first floor windows in the side facing elevations of the development hereby permitted shall be permanently fitted with obscured glass of a type to substantially restrict vision through it at all times and shall be non-opening, unless the parts of the windows which can be opened are more than 1.7m above the floor of the rooms in which the windows is installed. No further windows or other openings shall be formed in the side elevations.

Reason: To safeguard the privacy of occupiers of adjoining properties
(Section 12, NPPF)
4) No development shall commence until a detailed surface water drainage scheme, to manage surface water runoff from the development for up to and including the 1 in 100 year event (+40%CC), and a maintenance and management plan for the scheme has been submitted to and approved in writing by the Local Planning Authority. The discharge rate from the development will be limited to the equivalent 1 in 1 year rate, or an appropriate rate as agreed by the Bedford Group of Internal Drainage Boards. The final detailed design shall be based on the agreed drainage drawings (to be received) and DEFRAs Non-statutory technical standards for sustainable drainage systems (March 2018) and shall be implemented and maintained as approved. Maintenance will ensure the system functions as designed for the lifetime of the development. Any variation to the connections and controls indicated on the approved drawing which may be necessary at the time of construction would require the resubmission of those details to the Local Planning Authority for approval.
Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with para 163 and 165 of the NPPF and its supporting technical guidance.
5) No building/dwelling shall be occupied until the developer has formally submitted in writing to the Local Planning Authority a finalised 'Maintenance and Management Plan' for the entire surface water drainage system, inclusive of any adoption arrangements and/or private ownership or responsibilities, and that the approved surface water drainage scheme has been correctly and fully installed as per the final approved details.
Reason: To ensure that the implementation and long term operation of a sustainable drainage system (SuDS) is in line with what has been approved, in accordance with Written Statement HCWS161, 18th December 2014.
6) No development shall take place until a written scheme of archaeological investigation (WSI), that adopts a staged approach and includes provision for fieldwork followed by post excavation analysis and publication, has been submitted to and approved in writing by the Local Planning Authority. The development hereby approved shall only be implemented in full accordance with the approved archaeological scheme and this condition will only be fully discharged when the post-excavation analysis and reporting is complete, and the future of the site archive is secured.'

Reason: This condition is pre-commencement as a failure to secure appropriate archaeological investigation in advance of development would be contrary to paragraph 199 of the National Planning Policy Framework (NPPF) that requires developers to record and advance of understanding of the significance of any heritage assets affected by development before they are lost (wholly or in part).
7) No development shall take place until an Ecological Enhancement Strategy (EES) for the creation of new wildlife features such as the erection of bird/bat and bee boxes in buildings/structures and tree, hedgerow and shrub planting/establishment has been submitted to and approved in writing by the local planning authority. The content shall be informed by an up to date Ecological Appraisal of the site and include the:

a) purpose and objectives for the proposed works;
b) detailed design(s) and/or working method(s) necessary to achieve stated objectives (including, where relevant, type and source of materials to be used);
c) extent and location of proposed works shown on appropriate scale maps and plans;
d) timetable for implementation, demonstrating that works are aligned with the proposed phasing of construction;
e) persons responsible for implementing the works;
f) details of initial aftercare and long-term maintenance.

The works shall be carried out strictly in accordance with the approved details and shall be retained in that manner thereafter

Reason: To ensure development is ecologically sensitive and secures biodiversity enhancements in accordance with Policies CS14 and DM3 of the adopted Local Plan, Policy HQ1 of the emerging Local Plan and the NPPF.
8) No building shall be occupied until the junction of the proposed vehicular access with the highway has been constructed in accordance with the approved details.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premise, in accordance with Policies CS14 and DM3 of the adopted Local Plan, Policy HQ1 of the emerging Local Plan, the adopted Design Guide and the NPPF.
9) Before the premises are occupied all on site vehicular areas shall be surfaced in a stable and durable materials in accordance with details to be approved in writing by the Local Planning Authority. Arrangements shall be made for surface water drainage from the site to soak away within the site so that it does not discharge into the highway or into the main drainage system.

Reason:
To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure satisfactory parking of vehicles outside highway limits in accordance with Policies CS14 and DM3 of the adopted Local Plan, Policy HQ1 of the emerging Local Plan, the adopted Design Guide and the NPPF.
10) Above ground works shall not begin until a scheme for protecting the proposed dwellings from leisure and community facility noise has been submitted and approved in writing by the Local Planning Authority. The scheme shall be in accordance with the mitigation proposals in the revised NRG noise assessment dated April 2020. Any works which form part of the scheme approved by the Local Planning Authority shall be completed before any permitted dwelling is occupied unless an alternative period is agreed in writing by the Local Planning Authority.

Reason: In order to protect the amenity of future occupiers of the proposed dwellings and to safeguard the interests of adjacent commercial/industrial businesses. (Section 12, NPPF)
11) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 18-35-127, 18.35-123, 18.35-125, 18.35-120, 18.35-126, 18.35-122, 18.35-125 & 19418-DR-C-0100-P2.

Reason: To identify the approved plans and to avoid doubt.