Conditions or Reasons for Planning Application - CB/20/00216/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers TR1 P01, CM/2019-01/01, CM/2019-01/02B, CM/2019-01/03A & CM/2019-01/04A.

Reason: To identify the approved plan/s and to avoid doubt.
3) Development shall not begin until a scheme for protecting the proposed dwelling from noise from the public house and industrial estate has been submitted and approved by the local planning authority. Any works which form part of the scheme approved by the local authority shall be completed in full before any permitted dwelling is occupied.

Reason: to protect future residents from excessive noise and to safeguard the interests of local businesses.
4) In the event that contamination is found at any time when carrying out the approved development, it shall be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment shall then be undertaken by a competent person, in accordance with 'Model Procedures for the Management of Land Contamination, CLR 11'. A written report of the findings should be forwarded for approval to the Local Planning Authority. Following completion of remedial measures a verification report shall be prepared that demonstrates the effectiveness of the remediation carried out. No part of the development should be occupied until all remedial and validation works are approved in writing.

Reason: To ensure that no future investigation is required under Part 2A of the Environmental Protection Act 1990.
5) The proposed vehicular access shall be surfaced in bituminous or other similar durable material (not loose aggregate) for a distance of 5m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason
To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety.
6) The turning space for vehicles illustrated on the approved Plan (No 02B) shall be constructed before the development is first brought into use.

Reason
To enable vehicles to draw off, park and turn outside the highway limits thereby avoiding the reversing of vehicles on to the highway.
7) A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme before the building is occupied and be thereafter retained.

Reason: To safeguard the appearance of the completed development and the visual amenities of the locality.
(Section 12, NPPF)
8) No above ground level development shall take place until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality.
(Section 12, NPPF)