Conditions or Reasons for Planning Application - CB/20/00323/DOC
Conditions or Reasons:
9) No development shall take place until details of foul and surface water drainage have been submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details and retained in an operational state thereafter. No dwelling hereby permitted shall be occupied until its foul and surface water drainage has been implemented in accordance with the approved details.
10) No development shall take place until a scheme of highways works has been submitted to and approved in writing by the local planning authority. The scheme shall include details of pavement widening works along Astwick Road. The approved scheme shall then be implemented in accordance with the approved details prior to the first occupation of any dwelling hereby permitted.
12) No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to, and approved in writing by the local planning authority. The Statement shall provide for:
i) the parking of vehicles of site operatives and visitors;
ii) loading and unloading of plant and materials;
iii) storage of plant and materials used in constructing the development;
iv) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;
v) wheel washing facilities;
vi) measures to control the emission of dust and dirt during construction;
vii) a scheme for recycling/disposing of waste resulting from demolition and construction works;
viii) delivery, demolition and construction working hours.
The approved Construction Method Statement shall be adhered to throughout the construction period for the development.
13) Prior to the first occupation of any dwellings hereby permitted, a full travel plan shall be submitted to and approved in writing by the local planning authority. The Travel Plan shall be implemented in accordance with the approved details.
14) Development shall not commence until a phase II investigation of potential contamination is carried out and its results submitted to and approved in writing by the local planning authority. If the Phase II investigation indicates that remediation is necessary then a Remediation Statement shall be submitted to and approved in writing by the local planning authority. Remediation work shall then be carried out in accordance with the approved scheme. If remediation is required a Site completion Report detailing the conclusions and actions taken at each stage of the works, including validation works, shall be submitted to and approved in writing by the local planning authority prior to the first occupation of any dwelling hereby permitted.
15) No development shall take place until a written scheme of archaeological investigation / resource management; that includes post excavation analysis and publication has been submitted to and approved in writing by the local planning authority. The development hereby approved shall be implemented in full accordance with the approved scheme.
16) No development shall take place until a scheme has been submitted to and approved in writing by the local planning authority for the provision of fire hydrants at the development. Prior to the first occupation of the dwellings, the fire hydrants serving that development shall be installed and retained thereafter as approved.
17) No development shall take place until a scheme of sound attenuation to protect dwellings against external noise from the Fen End Industrial Estate has been submitted to and approved in writing by the local
planning authority. The scheme shall ensure the following:
i) that noise associated with Fen End Industrial Estate is mitigated to a rating level of at least 5dBA below the existing background noise level (LA90) within proposed outdoor living areas in accordance with
BS4142:2014;
ii) that noise levels within living rooms and bedrooms during the daytime shall be mitigated to NR30 and that noise levels within bedrooms during the night time shall be mitigated to NR25 in accordance with BS8233:2014.
No dwelling shall be occupied until it has been constructed in accordance with the approved details which shall thereafter be retained.