| Conditions or Reasons for Planning Application - CB/20/00931/DOC |
| Conditions or Reasons: | | 3)
3) Within two months of development commencing a detailed design of the surface water drainage scheme for the site (in its entirety), to manage up to and including the 1 in 100 year event (+40%CC) within the system, shall be submitted to and approved in writing by the Local Planning Authority. The scheme to be submitted shall include detailed plans and drawings of the final drainage system, including location, pipe run reference numbers, dimensions, gradients and levels (in metres above Ordinance Datum) and shall include all elements of the system proposed, including source control, storage, flow control and discharge elements. The scheme shall be implemented in accordance with the approved details before the development is completed and subsequently managed and maintained thereafter in accordance with the agreed management and maintenance plan. |
| 4)
Prior to the first occupation of the development hereby approved, a management and maintenance plan for the surface water drainage of the development shall be submitted to and agreed in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details, which shall be retained thereafter. |
| 5)
Prior to any above ground building works taking place, full details of the materials to be used on the external surfaces shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter proceed in accordance with the approved details. |
| 6)
Prior to any above ground building works taking place, full details of bird boxes and hedgehog fencing gaps shall be submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details prior to the first occupation of the development hereby permitted and shall retained in situ thereafter. |
10)
Prior to commencement of any above ground building works details of hard and soft landscape works, including an implementation and management plan, shall have been submitted to and approved in writing by the local planning authority. Details of soft landscape works shall include retention of any existing trees and hedges; finished levels/contours; planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate. The hard landscape works shall include means of enclosure; boundary and surface treatments. All works shall be carried out in accordance with the approved details and the implementation plan and thereafter maintained in accordance with the approved management plan. |
|
|---|