Conditions or Reasons for Planning Application - CB/20/01714/DOC
Conditions or Reasons:
2) No development shall take place until details of the existing and final ground and slab levels of the buildings hereby approved have been submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties, the location of which shall first be agreed in writing with the Local Planning Authority. Thereafter the site shall be developed in full accordance with the approved details.

Reason: To ensure that an acceptable relationship results between the new development and adjacent buildings and public areas.
(Section 12, NPPF)
6) No development shall take place, including any works of demolition, until a Construction Management Plan, associated with the development of the site, has been submitted to and approved in writing by the Local Planning Authority. This will include information on:

a) The construction programme and phasing (including hours of operation)
b) The parking of vehicles
c) Loading and unloading of plant and materials used in the development
d) Storage of plant and materials used in the development
e) The erection and maintenance of security hoarding / scaffolding
f) Wheel washing facilities
g) Measures on site to control the deposition of dirt / mud on surrounding roads during the development.
h) Footpath/footway/cycleway or road closures needed during the development period
i) Traffic management needed during the development period.
j) Times, routes and means of access and egress for construction traffic and delivery vehicles (including the import of materials and the removal of waste from the site) during the development of the site.
k) Details of consultation and complaint management with local businesses and neighbours
l) Waste management proposals
m) Mechanisms to deal with environmental impacts such as noise and vibration, air quality and dust, light and odour.
n) Details of any proposed piling operations, including justification for the proposed piling strategy, a vibration impact assessment and proposed control and mitigation measures.

All works shall be carried out in accordance with the approved CMP thereafter..

Reason: In the interests of safety, protecting the amenity of local land uses, neighbouring residents and the control of envrionmental impacts.

(Chapters 9 and 12 NPPF, DM3 CSDMP)