| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
Notwithstanding the details submitted with the application, full details of any structural building alterations in the body of the building (including works of structural 'opening up' to facilitate equipment installation and floor strengthening) required in implementation of the installation works hereby approved shall be submitted to the Local Planning Authority by way of written statement and supporting technical drawn detail at an appropriate scale, with clarifying drawing notes and annotations as appropriate, and approved in writing by the Local Planning Authority prior to any commencement of the approved works on site, and the approved works shall be undertaken thereafter strictly in accordance with the approved details.
Reason: This condition is pre-commencement to ensure that the approved works are carried out in a manner that safeguards the historic fabric and traditional character of this listed building (Section 16, NPPF) |
3)
Notwithstanding the details submitted with the application, any extension of roof cap incorporated grp cladding/panelling as part of the works hereby approved shall be undertaken in a manner that strictly maintains the roof profile and appearance of the existing grp cladding/panelling unless agreed otherwise and in writing by the Local Planning Authority in advance of installation and any preparatory roof cap modification. Reason: To ensure that the approved works are carried out in a manner that safeguards the historic and traditional character of this listed building and to safeguard the contribution this building makes to local character and distinctiveness (Section 16, NPPF) |
4)
The development hereby permitted shall be undertaken in full accordance with the Council's adopted 'Construction Code of Practice for Developers and Contractors' https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.
Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties and the local area (Section 12, NPPF) |
5)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers SBE052 - 01/ Issue: A5, SBE052 - 02/ Issue: A5, SBE052 - 03/ Issue: A5, SBE052 - 04/ Issue: A5, SBE052 - 05/ Issue: A5, SBE052 - 06/ Issue: A5, SBE052 - 07/ Issue: A5, SBE052 - 08/ Issue: A5, SBE052 - 09/ Issue: A5, SBE052 - 10/ Issue: A5, SBE052 - 12/ Issue: A5, SBE052 - 13/ Issue: A5, SBE052 - 15/ Issue: A5, SBE052 - 18/ Issue: A5 and SBE052 - 19/ Issue: A5.
Reason: To identify the approved plans and to avoid doubt. |
|
|---|