Conditions or Reasons for Planning Application - CB/20/02907/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) Before the commencement of any works associated to the erection of the Dwelling to the North of the site, the administration building and utlilty store labelled on Plan SC2005830 Rev A shall be demolished.

Reason: To ensure that the development on site is carried out in accordance with the plans.
3) No development shall take place, notwithstanding the details submitted with the application, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality.
(Section 12, NPPF)
4) Development shall not begin until details of the junction of the proposed vehicular access with the highway have been approved by the Local Planning Authority and no new building shall be occupied until the junction has been constructed in accordance with the approved details.

Reason
In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
5) No development approved by this permission shall take place until a Phase 1 Desk Study report documenting the ground conditions of the site with regard to potential contamination has been submitted to and approved in writing by the Local Planning Authority. This report shall adhere to BS10175:2011.

Where shown to be necessary by the Phase 1 Desk Study, a Phase 2 Site Investigation adhering to BS 10175:2011 shall submitted to and approved in writing by the Local Planning Authority.

Where shown to be necessary by the Phase 2 Site Investigation a detailed Phase 3 remediation scheme shall be submitted for approval in writing by the Local Planning Authority. This scheme shall detail measures to be taken to mitigate any risks to human health, groundwater and the wider environment. Any works which form part of the Phase 3 scheme approved by the local authority shall be completed in full before any permitted building is occupied.

The effectiveness of any scheme shall be demonstrated to the Local Planning Authority by means of a validation report (to incorporate photographs, material transport tickets and validation sampling), unless an alternative period is approved in writing by the Authority. Any such validation should include responses to any unexpected contamination discovered during works.

Reason: To protect human health and the environment
6) No development shall take place until a scheme for protecting the proposed dwelling from noise from road and rail traffic has been submitted to and approved in writing by the local planning authority.  The dwelling shall not be occupied until such a scheme has been implemented in accordance with the approved details, and shown to be effective, and it shall be retained in accordance with those details thereafter.

Reason: To protect the amenity of future occupiers of the dwelling hereby approved
7) No above ground development shall takes place until a landscaping scheme to include all hard and soft landscaping and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To ensure an acceptable standard of landscaping.
(Sections 12 & 15, NPPF)
8) A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme [before the use hereby permitted is commenced / before the building(s) is/are occupied] and be thereafter retained.

Reason: To safeguard the appearance of the completed development and the visual amenities of the locality.
(Section 12, NPPF)
9) The development hereby permitted shall be undertaken in full accordance with the Councils adopted Construction Code of Practice for Developers and Contractors https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.

Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties (Section 12, NPPF)
10) Notwithstanding the provisions of Part 1, Class A of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building(s) hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.

Reason: To control the external appearance of the building/s in the interests of the amenities of the area.
(Section 12, NPPF)
11) Notwithstanding the provisions of Part 1 Class E of Schedule 2 to the Town and Country (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no buildings or other structures shall be erected or constructed within the curtilage of the property without the grant of further specific planning permission from the Local Planning Authority.

Reason: To control the development in the interests of the visual amenity of the area.
(Section 12, NPPF)
12) The dwelling hereby permitted shall only be occupied by a person who is an owner or is or was last employed at the boatyard that is hereby permitted by this permission, or a widow or widower of such a person and any resident dependents.

Reason: To protect the Boatyard from being prejudiced by complaints of excessive noise or disturbance from future occupiers of the dwelling.
(Section 15, NPPF)
13) Prior to the occupation of the proposed dwelling, a scheme for the provision of waste receptacles for the dwelling shall be submitted to and agreed in writing by the Local Planning Authority. The receptacles shall be provided before occupation takes place.

Reason: In the interest of residential amenity and to reduce waste generation in accordance with the Councils's Minerals and Waste Local Plan 2014, Policy WSP5 and the adopted SPD "Managing Waste in New Developments" (2006).
14) Visibility splays shall be provided at the junction of the access with the public highway before the development is brought into use. The minimum dimensions to provide the required splay lines shall be 2.4m measured along the centre line of the proposed accesses from their junction with the channel of the public highway and 43m measured from the centre line of the proposed access along the line of the channel of the public highway.  The required vision splays shall, on land in the applicant's control, be kept free of any obstruction.

Reason
To provide adequate visibility between the existing highway and the proposed accesses and to make the accesses safe and convenient for the traffic which is likely to use it them.
15) Prior to occupation, a scheme for the parking of cycles on the site shall be submitted to and approved in writing by the Local Planning Authority.  The scheme shall be fully implemented before the development is first occupied or brought into use and thereafter retained for this purpose.

Reason
To ensure the provision of adequate cycle parking to meet the needs of occupiers of the proposed development in the interests of encouraging the use of sustainable modes of transport.
16) The development shall not be brought into use until a turning space for service vehicles has been constructed within the curtilage of the site in a manner to be approved in writing by the Local Planning Authority.

Reason
To enable vehicles to draw off, park and turn outside of the highway limits thereby avoiding the reversing of vehicles on to the highway.
17) Any gates provided shall open away from and not encroach upon the public highway.

Reason
In order to minimise danger, obstruction and inconvenience to users of the highway and of the premises.
18) The proposed vehicular driveway shall be surfaced in bituminous or other similar durable material (not loose aggregate) which shall be approved in writing by the Local Planning Authority for a minimum distance of 5m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason
To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety.
19) The development hereby permitted shall be undertaken in full accordance with the Councils adopted Environmental Code of Practice https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning/3

Reason: In order to minimise the impact of development on existing trees, landscape features and biodiversity (Section 15, NPPF)
20) The development shall not be brought into use until the recommendations as outlined in the Phase 1 Habitat and protected species survey dated 19th October 2020 by ERA Consultancy have been carried out. The development will thereafter be carried out in accordance with the approved details.

Reason: To ensure net gain biodiversity for the development (Section 15 NPPF).
21) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers SC/2005830 02 Rev A and SC/2005830 03 Rev A.

Reason: To identify the approved plan/s and to avoid doubt.