| Conditions or Reasons: | 6)
All residential caravans together with any structures, equipment and materials brought on to or erected on the land, or works undertaken to it in connection with the siting of the caravans, shall be removed and the land shall be restored to its condition before the development took place within 28 days of the date of failure to meet any one of the requirements set out in (A) to (D) below:
(A) within 3 months of the date of this decision a scheme (including a timetable for completion of the works) detailing:
the waste storage facilities to serve the various parts of the site; and a landscaping treatment scheme for the area marked as "play area" marked on the approved plan, clearly identifying details of all tree, hedge and shrub planting including details of species, plant sizes and proposed numbers as well as the material and height detail of the proposed fencing. a suitable method of foul water disposal shall have been submitted to the local planning authority;
(B) within 11 months of the date of this decision the site development scheme shall have been approved by the Local Planning Authority or, if the Local Planning Authority refuse to approve the scheme, or fail to give a decision within the prescribed period, an appeal shall have been made to, and accepted as validly made by, the Secretary of State;
(C) if an appeal is made in pursuance of (B) above, that appeal shall have been finally determined and the submitted site development scheme shall have been approved by the Secretary of State; and
(D) the approved scheme shall have been carried out and completed in accordance with the approved timetable, or in accordance with any amended details and/or revised timetables as might be agreed from time to time in writing by the Local Planning Authority.
Reason: In order to ensure that the proposal takes account for the need for hard and soft landscaping and that the development has no adverse effect upon general or residential amenity in accordance with Policy BE8 of the South Bedfordshire Local Plan Review and having particular regard to the location of the site in the Green Belt and an AONB and AGLV in accordance with Sections 12, 13 and 15 of the NPPF and Policy NE3 of the South Bedfordshire Local Plan Review. |
7)
At the same time as the site development scheme required by Condition 6 is submitted to the Local Planning Authority there shall be submitted a programme of management and maintenance of the foul drainage system for the lifetime of the development. The drainage system shall be managed and maintained in accordance with the approved programme.
Reason: In order to ensure that the development has no unacceptable adverse effect upon general or residential amenity in accordance with Policy BE8 of the South Bedfordshire Local Plan Review and having regard to Sections 14 and 15 of the NPPF. |
8)
At the same time as the site development scheme required by Condition 6 is submitted to the Local Planning Authority there shall be submitted a schedule of maintenance for a period of five years of the proposed planting beginning at the completion of the final phase of implementation as required by that condition; the schedule to make provision for the replacement, in the same position, of any tree, hedge or shrub that is removed, uprooted or destroyed or dies or, in the opinion of the Local Planning Authority, becomes seriously damaged or defective, with another of the same species and size as that originally planted. The maintenance shall be carried out in accordance with the approved schedule.
Reason: In order to ensure that the proposal takes account for the need for hard and soft landscaping in accordance with Policy BE8 of the South Bedfordshire Local Plan Review and having particular regard to the location of the site in the Green Belt and an AONB and AGLV in accordance with the provisions of Sections 12, 13 and 15 of the NPPF and Policy NE3 of the South Bedfordshire Local Plan. |
|
|---|