| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the 13th March 2018.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
No development shall take place, notwithstanding the details submitted with the application, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality. (Section 12, NPPF) |
3)
The windows shown in the east elevation of the dwelling hereby approved shall be permanently fitted with obscured glass of a type to substantially restrict vision through them at all times and no further windows or other openings shall be formed in this elevation other than with specific written permission from the Local Planning Authority.
Reason: To safeguard the privacy of occupiers of the adjoining property. (Policies BE8, SBLPR and Section 7, NPPF) |
4)
Before the access is first brought into use an area of land across the whole of the site frontage measuring at least 2.4m from and parallel to the nearside edge of the adjacent road carriageway shall be provided and thereafter be kept free of all obstruction to visibility exceeding a height of 600mm above the adjoining carriageway level.
Reason: To provide adequate visibility between the existing highway and the proposed means of access and to make the access safe and convenient for the traffic that is likely to use it. (Section 4, NPPF) |
5)
Construction work shall not begin until details of a scheme showing the provision of a 2m wide footway across the site frontage on the north western side of Tebworth Road has been submitted to and approved in writing by the Local Planning Authority and the dwelling shall not be first occupied until the footway has been constructed in accordance with approved details. Any Statutory Undertakers equipment or street furniture shall be re-sited to provide an unobstructed footway.
Reason: In the interests of road safety and pedestrian movement. (Section 4, NPPF) |
6)
Any gates provided shall open away from the highway and be set back a distance of at least 5.0 metres from the nearside edge of the carriageway of the adjoining highway.
Reason: To enable vehicles to draw off the highway before the gates are opened. (Section 4, NPPF) |
7)
Before the development hereby permitted is first occupied or brought into use, the scheme for parking, garaging and manoeuvring shown on Drawing 4120/L4 shall be laid out, drained and surfaced in accordance with details previously submitted to and approved in writing by the Local Planning Authority and those areas shall not thereafter be used for any other purpose.
Reason: To enable vehicles to draw off, park and turn clear of the highway to minimise danger, obstruction and inconvenience to users of the adjoining highway. |
8)
Development shall not begin until details of the junction of the modified vehicular access with the highway have been submitted to and approved in writing by the Local Planning Authority and the proposed dwelling shall not be first occupied until the junction has been constructed in accordance with the approved details.
Reason In order to minimise danger, obstruction and inconvenience to users of the highway and the premises. (Section 4, NPPF) |
9)
No development approved by this permission shall take place until the following has been submitted to and approved in writing by the Local Planning Authority:
A Phase 1 Desk Study report documenting the ground conditions of the site with regard to potential contamination;
A Phase 2 Site Investigation (where shown as necessary by the Phase 1 Desk Study);
A Phase 3 Remediation Scheme (where shown as necessary by the Phase 2 Site Investigation)
All such work shall be undertaken in accordance with BS:10175:2011 or other appropriate guidance issued by the regulatory authorities. The work shall be sufficient to ensure that measures will be taken to mitigate any risks to human health and the wider environment.
Reason: To protect human health and the environment. (Section 11, NPPF) |
10)
Prior to the permitted dwelling being first occupied a validation report shall be submitted and approved in writing by the Local Planning Authority to demonstrate the effectiveness of any agreed Remediation Strategy . Any such validation shall include responses to any unexpected contamination discovered during works.
Reason: To protect human health and the environment. (Section 11, NPPF) |
11)
No development or demolition shall take place until a written scheme of archaeological investigation, that adopts a staged approach and includes the provision for post excavation analysis and publication, has been submitted to and approved in writing by the Local Planning Authority. The development hereby approved shall only be implemented in full accordance with the approved archaeological scheme.
Reason: This condition is pre-commencement as a failure to secure appropriate archaeological investigation in advance of development would be contrary to paragraph 141 of the National Planning Policy Framework (NPPF) that requires developers to record and advance of understanding of the significance of any heritage assets to be lost (wholly or in part) as a consequence of the development (Section 12, NPPF) |
12)
Notwithstanding the provisions of Part 1, Class A of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to the dwelling hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the external appearance of the dwelling in the interests of the amenities of the area and to preserve the openness of the Green Belt. (Policy BE8, SBLPR and Sections 7 & 9, NPPF) |
13)
Notwithstanding the provisions of Part 1 Class E of Schedule 2 to the Town and Country (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no buildings or other structures shall be erected or constructed within the curtilage of the property without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the development in the interests of the visual amenity of the area and to preserve the openness of the Green Belt and open countryside. (Policies BE8, SBLPR and Sections 7 & 9, NPPF) |
14)
Prior to the occupation of the dwelling on the site, a scheme for the provision of waste receptacles for the dwelling shall be submitted to and agreed in writing by the Local Planning Authority. The receptacles shall be provided before first occupation takes place.
Reason: In the interest of residential amenity and to reduce waste generation in accordance with the Councils's Minerals and Waste Local Plan 2014, Policy WSP5 and the adopted SPD "Managing Waste in New Developments" (2006). |
15)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 4120-P1C, 4120-L4, 4120-1G1B and 4120-P3.
Reason: To identify the approved plans and to avoid doubt. |
|
|---|