<< Back to case
Conditions or Reasons for Planning Application - CB/21/00505/FULL
Conditions or Reasons:
1) The permission is for a temporary period only expiring on the 30th April 2026 on or before which date the access hereby approved shall be removed. The land shall be restored in compliance with hard and soft landscaping details which have been previously submitted to and approved in writing by the Local Planning Authority. The landscaping scheme shall be completed before the end of the first available planting season following removal of the access.

Reason: For the avoidance of doubt and in the interest of road safety and to reduce the number of points at which traffic will enter and leave the public highway and to safeguard the character and appearance of the area. (Section 12, NPPF)
2) Notwithstanding the details shown, development shall not begin until details of the junction of the proposed temporary vehicular access with the highway have been approved by the Highway Agreements Team, which shall include reinstatement details upon occupation of the last dwelling on the development subject to planning application CB/21/00239/RM.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises and return the area to its original condition.
3) Visibility splays shall be provided at all road junctions within the site. The minimum dimensions to provide the required splay lines shall be 2.4m measured along the centre line of the side road from its junction with the channel to the through road and 43m measured from the centre line of the side road along the channel of the through road. The vision splays required shall be provided and defined on the site by or on behalf of the developers and be entirely free of any obstruction. 

Reason: To provide adequate visibility at road junction in the interest of road safety.
4) The temporary access shall not be brought in to use until condition 10 of CB/18/01099/OUT has been approved by the Local Planning Authority.

Reason: In the interest of road safety and for the avoidance of doubt.
5) Any surface water flow on or off, of this access must be contained and controlled on site without detriment to surrounding properties.

Reason: To ensure accordance with para 163 and 165 of the NPPF and its supporting technical guidance
6) The development hereby permitted shall be carried out only in accordance with the details shown on the following plans:
001-01
008-01Rev A
MPD044-CEMP-01

Reason: For the avoidance of doubt to ensure that the development is carried out in accordance with the approved plans.


Return to Search | Close WindowTop of Page