| Conditions or Reasons for Planning Application - CB/21/01130/FULL |
| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the existing building.
Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match the existing building in the interests of the visual amenities of the locality. (Section 12, NPPF) |
3)
No development shall take place, including any works of demolition, until a Construction Traffic Management Plan, associated with the development of the site, has been submitted and approved in writing by the Local Planning Authority which will include information on: (A) The parking of vehicles (B) Loading and unloading of plant and materials used in the development (C) Storage of plant and materials used in the development (D) The erection and maintenance of security hoarding / scaffolding affecting the highway if required. (E) Wheel washing facilities (F) Measures on site to control the deposition of dirt / mud on surrounding roads during the development. (G) Footpath/footway/cycleway or road closures needed during the development period (if required) (H) Traffic management needed during the development period. (I) Times, routes and means of access and egress for construction traffic and delivery vehicles (including the import of materials and the removal of waste from the site) during the development of the site.
Reason: Given the nature of the approved works and relationship with the highway, additional detailed information regarding construction management is required to ensure that the development will be implemented with limited harm to highway access arrangements and the living conditions of neighbouring properties. |
4)
Part A: No development shall take place until an archaeological written scheme of investigation (WSI), has been submitted to and approved in writing by the Local Planning Authority.
The WSI shall include the following components:
1.method statements for the investigation of all archaeological remains present at thesite 2.method statements for the preservation in situ of any archaeological remains that cannot be fully investigated (if appropriate) 3.an outline strategy for post-excavation assessment, analysis and publication, including details of the timetable for each stage of the post-excavation works
Part B: The said development shall only be implemented in full accordance with the approved WSI and this condition shall only be fully discharged when:
1.it has been confirmed in writing by the Local Planning Authority that all elements of the archaeological field work have been completed 2.a Post Excavation Assessment report and an Updated Project Design or a final archaeological report has been submitted to and approved in writing by the Local Planning Authority. This shall be done within twelve months of the completion of the archaeological fieldwork unless otherwise agreed in advance in writing by the Local Planning Authority 3.the post-excavation analysis as specified in the approved Updated Project Design (if a UPD is prepared); the preparation of the site archive ready for deposition at a store approved by the Local Planning Authority; the preparation of an archive report and the submission of a publication report have all been completed. This shall be done within two years of the conclusion of the archaeological fieldwork unless otherwise agreed in advance in writing by the Local Planning Authority
This condition is pre-commencement as a failure to secure archaeological investigation inadvance of development and to make the record of that work publicly available would be contrary to paragraph 199 of the National Planning Policy Framework that requires developers to record and advance of understanding of the significance of any heritage assets affected by development before they are lost (wholly or in part). Chapter 16, NPPF (2019) |
5)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 20-J3521-100, 20-J3521-101, 20-J3521-LP01.
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|