<< Back to case
Conditions or Reasons for Planning Application - CB/21/01213/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the existing building.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match the existing building in the interests of the visual amenities of the locality.
(Section 12, NPPF)
3) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers Site location plan 1: 1250. Block plans 1;500 and 20/46/01/A.

Reason: To identify the approved plan/s and to avoid doubt.
4) The first floor windows in the north and south elevations, the ground floor living room window in the north facing elevation and the first floor east facing rear en suite window of the development hereby permitted shall be permanently fitted with obscured glass of a type to substantially restrict vision through them at all times and shall be non-opening, unless the parts of the windows which can be opened are more than 1.7m above the floor of the rooms in which the windows are installed or in the case of the en suite window in the first floor of the east facing elevation - fitted with a restricted opening. No further windows or other openings shall be formed in the north and south facing elevations.

Reason: To safeguard the privacy of occupiers of adjoining properties
(Section 12, NPPF)


Return to Search | Close WindowTop of Page