Conditions or Reasons for Planning Application - CB/21/02096/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) No development shall take place until a landscaping scheme to include all hard and soft landscaping and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To ensure an acceptable standard of landscaping.
(Sections 12 & 15, NPPF)
3) Development shall not begin until details of refuse storage area and collection point have been approved by the Local Planning Authority and no building shall be occupied until the said storage and collection points have been constructed in accordance with the approved details.

Reason
To ensure the refuse collection bins do not cause a hazard or obstruction to the highway or parking area. (Section 9 NPPF)
4) A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme before the buildings are occupied] and be thereafter retained.

Reason: To safeguard the appearance of the completed development and the visual amenities of the locality.
(Section 12, NPPF)
5) The maximum gradient of the vehicular access shall be 10% (1 in 10).

Reason:
In the interests of the safety of persons using the access and users of the highway. (Section 9 NPPF)
6) Any gates provided shall open away from the highway and be set back a distance of at least 5.0m from the nearside edge of the carriageway of the adjoining highway.

Reason
To enable vehicles to draw off the highway before the gates are opened. (Section 9 NPPF)
7) Before the premises are occupied all on site vehicular areas shall be surfaced in a manner to the Local Planning Authority's approval so as to ensure satisfactory parking of vehicles outside highway limits. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason
In order to minimise danger, obstruction, and inconvenience to users of the highway and of the premises. (Section 9 NPPF)
8) Prior to the construction of vehicular parking areas associated with the approved development, a scheme for the charging of electric vehicles shall be submitted to and approved in writing by the Local Planning Authority. Subsequently, the development shall be completed in accordance with these approved details.

Reason: To assist with the transition to low-emission vehicles in line with Section 9 of the National Planning Policy Framework (2021)
9) The development hereby permitted shall be undertaken in full accordance with the Councils adopted Construction Code of Practice for Developers and Contractors https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.

Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties (Section 12, NPPF)
10) The development hereby permitted shall be undertaken in full accordance with the Councils adopted Environmental Code of Practice https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning/3

Reason: In order to minimise the impact of development on existing trees, landscape features and biodiversity (Section 15, NPPF)
11) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers Q2_102_PL_PR12 Rev A, Q2_102_PL_PR11 Rev A, Q2_108_PL_EX13, Q2_102_PL_EX12, Q2_102_PL_EX11, BES20435 drg No 6 Rev A, Q2_108_PL_PR13, BES20435 drg No 5 Rev A and Q2_102_PL_0001.

Reason: To identify the approved plan/s and to avoid doubt.