| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
Prior to the occupation of the dwelling hereby approved a landscaping scheme to include all hard and soft landscaping including boundary treatment and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme shall have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.
Reason: To ensure an acceptable standard of landscaping. (Sections 12 & 15, NPPF) |
3)
Notwithstanding the provisions of Part 1, Class A and D of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the external appearance of the building/s in the interests of the amenities of the area and to protect the openness of the Green Belt. (Section 12 and 13 NPPF) |
4)
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no fences, gates, walls or other means of enclosure shall be erected within the curtilage of the property without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the development in the interests of the rural amenity of the area and the openness of the Green Belt. (Section 12 and 13, NPPF) |
5)
Notwithstanding the provisions of Part 1 Class E of Schedule 2 to the Town and Country (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no buildings or other structures shall be erected or constructed within the curtilage of the property without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the development in the interests of the visual amenity of the area and the openness of the Green Belt. (Section 12 and 13, NPPF) |
6)
The development hereby approved shall be constructed in materials as shown on plan number SK2B unless approved in writing by the Local Planning Authority.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality. (Section 12, NPPF) |
7)
No development shall take place until details of the existing and final ground and slab levels of the buildings hereby approved have been submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties, the location of which shall first be agreed in writing with the Local Planning Authority. Thereafter the site shall be developed in full accordance with the approved details.
Reason: To ensure that an acceptable relationship results between the new development and adjacent buildings and public areas. (Section 12, NPPF) |
8)
All ecological measures and/or works shall be carried out in accordance with the details contained in the August 2021 Emergence Survey Report Bats (Document reference; CE1853-01) as already submitted with the planning application and agreed in principle with the local planning authority prior to determination.
Reason To protect endangered species |
9)
No development shall commence until a detailed surface water drainage scheme, to manage surface water runoff from the development for up to and including the 1 in 100 year event (+40%CC), and a maintenance and management plan for the scheme has been submitted to and approved in writing by the Local Planning Authority. The discharge is to be via soakaway. The final detailed design shall be based on the agreed drainage Strategy (Ref: to be submitted) and DEFRAs Non-statutory technical standards for sustainable drainage systems (March 2018) and shall be implemented and maintained as approved. Maintenance will ensure the system functions as designed for the lifetime of the development. Any variation to the connections and controls indicated on the approved drawing which may be necessary at the time of construction would require the resubmission of those details to the Local Planning Authority for approval.
Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with para 163 and 165 of the NPPF and its supporting technical guidance. |
10)
No building/dwelling shall be occupied until the developer has formally submitted in writing to the Local Planning Authority a finalised 'Maintenance and Management Plan' for the entire surface water drainage system, inclusive of any adoption arrangements and/or private ownership or responsibilities, and that the approved surface water drainage scheme has been correctly and fully installed as per the final approved details. Reason: To ensure that the implementation and long term operation of a sustainable drainage system (SuDS) is in line with what has been approved, in accordance with Written Statement HCWS161, 18th December 2014. |
11)
The proposed vehicular access shall be surfaced in bituminous or other similar durable material (not loose aggregate) as may be approved in writing by the Local Planning Authority for a distance of 5m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
Reason To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety. |
12)
The turning space for vehicles illustrated on the approved Plan (No 003 C) shall be constructed before the development is first brought into use.
Reason To enable vehicles to draw off, park and turn outside the highway limits thereby avoiding the reversing of vehicles on to the highway. |
13)
Any gates provided shall open away from the highway and be set back a distance of at least 5.0m (domestic)/8.0 metres (agricultural) from the nearside edge of the carriageway of the adjoining highway.
Reason To enable vehicles to draw off the highway before the gates are opened. |
14)
The development hereby permitted shall be undertaken in full accordance with the Councils adopted Construction Code of Practice for Developers and Contractors https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.
Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties (Section 12, NPPF) |
15)
Prior to the occupation of the dwelling, a scheme (based on current government policy/guidance at the time of submission) for additional electric charging points shall be submitted to and approved in writing by the local planning authority. The charging points shall be provided as approved prior to the occupation of the building. Reason: To ensure the development protects and exploits opportunities for the use of sustainable transport modes for the movement of people in accordance with section 4 of the National Planning Policy Framework. |
16)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 006, 004, 001, SK2B, SK1B and 003B.
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|