| Conditions or Reasons: | 1)
The works shall begin not later than three years from the date of this consent.
Reason: To comply with Section 18 of the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
Prior to commencement of above ground works/installation, a schedule of all external finish materials including in-line roof tile vents, shall be submitted to and approved in writing by the Local Planning Authority. Works shall be implemented in accordance with the approved materials and details specified and shall be permanently maintained as such. (Section 16, NPPF) |
| 3)
A schedule of drawings that show details of all proposed windows, including conservation rooflights (the rooflight shall have a vertical glazing bar, a maximum distance between the top and sides of the window and adjacent roof covering of 50 millimetres, have lead flashings and soakers and have no parts that project above the plane of the roof), doors, barn doors, and hatches, in section and elevation at scales between 1:20 and 1:1 as appropriate, showing details of glazing type, framing, glazing bars, cills, and ironmongery, shall be submitted to and approved in writing by the Local Planning Authority. Works shall be implemented only in accordance with the approved details and shall be permanently maintained as such. (Section 16 NPPF) |
| 4)
Prior to the reinstatement of the fireplaces, a schedule of finish materials and specification of the fireplace design, shall be submitted to and approved in writing by the Local Planning Authority. Works shall be implemented in accordance with the approved materials and details specified and shall be permanently maintained as such. (Section 16 NPPF) |
| 5)
Rainwater goods shall be black painted or powder-coated metal and shall be permanently maintained as such. (Section 16 NPPF). |
7)
This consent relates only to the details shown on the submitted plans, numbers B3e, B7c, B8c, B9d, B15, L1B, L4H, L5H, WC 01.
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|