1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers BL.02.02 Rev F, BL.02.03 Rev C, BL.02.05 Rev C, BL.02.04 Rev C, BL.02.06 Rev B, BL.02.09, BL.02.01 Rev B, BL.02.07 Rev B.

Reason: To identify the approved plan/s and to avoid doubt.
3) The development hereby permitted shall be undertaken in full accordance with the Councils adopted Construction Code of Practice for Developers and Contractors https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.

Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties (Section 12, NPPF)
4) The development hereby permitted shall be undertaken in full accordance with the Councils adopted Environmental Code of Practice https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning/3

Reason: In order to minimise the impact of development on existing trees, landscape features and biodiversity (Section 15, NPPF)
5) Prior to the construction of vehicular parking areas associated with the approved dwellings, a scheme for the charging of electric and ultra-low emission vehicles shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall accord with Policy T5 of CBLP and shall include the following:

Details of active charging posts or passive provision such as cabling and electricity supply for each dwelling
Timescales / triggers for implementation of the scheme.

The development shall be completed in accordance with these approved details including the agreed timescales / triggers.

Reason: To assist with the transition to low-emission vehicles in line with Policy T5 of the CBLP and paragraph 110 of the National Planning
6) No building shall be occupied until the junction of the proposed vehicular access with the highway has been constructed in accordance with the approved details.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
7) No dwelling shall be occupied until a 2m wide footway connection between the development access and new footway provision from planning application CB/19/02382/OUT, has been constructed along Ickwell Road in accordance with details of a scheme to be submitted to and approved by the Local Planning Authority prior to commencement of development. Any Statutory Undertakers equipment or street furniture shall be re-sited to provide an unobstructed footway.

Reason: In the interests of road safety and pedestrian movement.
8) The proposed vehicular access shall be surfaced in bituminous or other similar durable material (not loose aggregate) as may be approved in writing by the Local Planning Authority for a distance of 5m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety.
9) The parking and turning areas for vehicles illustrated on the approved plans shall be retained throughout the lifetime of the development for the purpose of parking and turning only.

Reason: To enable vehicles to draw off, park and turn outside the highway limits thereby avoiding the reversing of vehicles on to the highway.
10) Notwithstanding the submitted plans, details of a communal refuse collection point located at the site frontage and outside of the highway and any visibility splays shall be submitted to and approved by the Local Planning Authority prior to the occupation of any dwelling. The scheme shall be fully implemented prior to occupation of any dwelling and shall be retained thereafter.

Reason: In the interest of amenity and in order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
11) No development shall commence until full details of a surface water drainage scheme, to include the contributing impermeable area, size, design and layout of the proposed soakaways / drainage scheme and details of how all roof areas and increase in hard standing areas are to be drained, have been submitted to and approved in writing by the local planning authority. For the avoidance of doubt, any soakaway should be designed so that the storage area can discharge from full to 50% capacity within a 24-hour period. The surface water drainage scheme shall be implemented and maintained as approved. Maintenance will ensure the system functions as designed for the lifetime of the development. Any variation to the connections and controls indicated on the approved drawing which may be necessary at the time of construction would require their submission of those details to the Local Planning Authority for approval.

Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with para 167 of the NPPF and its supporting technical guidance.
12) No building/dwelling shall be occupied until the developer has formally submitted in writing to the Local Planning Authority a finalised 'Maintenance and Management Plan' for the entire surface water drainage system, inclusive of any adoption arrangements and/or private ownership or responsibilities, and that the approved surface water drainage scheme has been correctly and fully installed as per the final approved details.

Reason: To ensure that the implementation and long-term operation of a sustainable drainage system (SuDS) is in line with the objectives of Policies CC3 and CC5 of the CBLP (2021).
13) All dwellings hereby approved must comply with the water efficiency standard of 110 litres per person per day as detailed by Regulation 36(2)(b) of Part G of Schedule 1 and Regulation 36 to the Building Regulations 2010 (as amended).

Reason: To ensure the efficient use of water in accordance with Policy CC1 of the CBLP (2021) and the objectives of sustainability set out in the NPPF (2021).
14) No above ground works shall take place until a landscaping scheme to include all hard and soft landscaping and boundary treatments and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To ensure the development is suitably landscaped, and residential amenity retained, in the interests of visual amenity and achieving a high-quality living environment.
15) No above ground works shall take place until a scheme for ecological enhancements has been submitted to an approved in writing by the local planning authority. The measures within the scheme shall be implemented as approved and retained thereafter in perpetuity.

Reason: To ensure that the development delivers ecological enhancements in accordance with Policy EE3 of the Central Bedfordshire Local Plan (2021).
16) The development shall be carried out in complete accordance with the approved details set out in document "Building Materials" unless otherwise approved in writing by the Local Planning Authority.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality.
(Section 12, NPPF)