<< Back to case
Conditions or Reasons for Planning Application - CB/21/04128/DOC
Conditions or Reasons:
12) Notwithstanding the approved landscape details and plans, details of landscaping in the areas to both sides of the access road and in the communal amenity area, to include species of appropriate size and which reference the historic orchard use of the site, shall be submitted to and approved in writing prior to the first occupation of the development. The approved landscaping shall be implemented by the end of the full planting season immediately following the completion and/or first occupation of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained and retained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To ensure an acceptable standard of landscaping.
(Sections 12 & 15, NPPF 2018)
15) The development hereby approved shall be implemented in accordance with the submitted Surface Water Drainage Scheme (JPP Consulting, reference U8771WR) before the development is completed and shall be managed and maintained thereafter in accordance with the agreed maintenance plan. No dwelling shall be occupied until the developer has formally submitted in writing to the Local Planning Authority that the approved Surface Water Drainage Scheme has been checked by them and has been correctly and fully installed as per the approved details. 

Reason: To ensure that the implementation and long term operation of a drainage system is in line with what has been approved.
(Section 14, NPPF 2018)


Return to Search | Close WindowTop of Page