Conditions or Reasons for Planning Application - CB/21/04385/DOC
Conditions or Reasons:
2) The development shall be carried out strictly in accordance with either an Ecological Enhancement Strategy that is approved pursuant to Conditions 15 and 17 of planning permission CB/18/04165/OUT or a separate Ecological Enhancement Strategy which is to be submitted to and approved in writing by the Local Planning Authority prior to the commencement of development and shall contain the following information:

a) An ecological assessment of the site prior to any development taking place,
b) Purpose and conservation objectives for the proposed development informed by a review of the existing ecological assessment.
b) Review of site potential and constraints.
c) Detailed design(s) and/or working method(s) to achieve stated objectives.
d) Extent and location/area of proposed works on appropriate scale plans.
e) Type and source of materials to be used where appropriate, e.g. native species of local provenance.
f) Timetable for implementation demonstrating that works are aligned with the proposed phasing of development.
g) Persons responsible for implementing the works.
h) Details of initial aftercare and long-term maintenance.

Reason: To enable proper consideration of the impact of the development on the contribution of nature conservation.
(Section 15, NPPF)
7) The development shall take place strictly in accordance with either a Construction Traffic Management Plan that has been approved pursuant to condition 9 of planning permission CB/18/04165/OUT or a separate Construction Traffic Management which is to be submitted to and approved in writing by the Local Planning Authority prior to the commencement of development and shall contain the following information:

(A) The parking of vehicles
(B) Loading and unloading of plant and materials used in the development
(C) Storage of plant and materials used in the development
(D) The erection and maintenance of security hoarding / scaffolding affecting the highway if required.
(E) Wheel washing facilities
(F) Measures on site to control the deposition of dirt / mud on surrounding roads during the development.
(G) Footpath/footway/cycleway or road closures needed during the development period
(H) Traffic management needed during the development period including tracking for those building materials and plant equipment brought in by HGV's.
(I) Times, routes and means of access and egress for construction traffic and delivery vehicles (including the import of materials and the removal of waste from the site) during the development of the site.

Reason: To ensure the safe operation of the surrounding road network in the interests of road safety.
(Section 9, NPPF)
11) No development shall take place above slab level until a scheme has been submitted to and approved in writing by the Local Planning Authority for the provision of fire hydrants at the development. Prior to the first occupation of the dwellings hereby approved the fire hydrant(s) serving the dwellings shall be installed as approved. Thereafter the fire hydrant(s) shall be retained as approved in perpetuity.

Reason: In the interests of fire safety and providing safe and accessible developments.
(Section 8, NPPF)