Conditions or Reasons for Planning Application - CB/21/05389/DOC
Conditions or Reasons:
6) No above ground building work shall take place until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality.
(Section 12, NPPF)
7) Notwithstanding the details submitted with the application, no above ground building work shall commence until details of hard surface materials for footways and the road associated with the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To ensure adequate provision of hard surfacing and to control the appearance of the development in the interests of the visual amenities of the locality.
(Section 12, NPPF)
8) No above ground building work shall take place until the developer has formally submitted in writing to the Local Planning Authority a finalised 'Maintenance and Management Plan' for the entire surface water drainage system, inclusive of any adoption arrangements and/or private ownership or responsibilities, and that the approved surface water drainage scheme has been correctly and fully installed as per the final approved details.
Reason:
To ensure that the implementation and long term operation of a sustainable drainage system (SuDS) is in line with what has been approved, in accordance with Written Statement HCWS161.
9) No above ground building work shall commence until a scheme to protect proposed dwellings from noise from plant etc. at the proposed development has been submitted and approved in writing by the local planning authority. The development will be carried out in accordance with the approved details. The scheme shall include details of noise barrier(s) at boundaries, building insulation and a ventilation strategy for the proposed dwellings.

Reason: To protect the amenity of existing residential occupiers and future occupiers of the proposed dwellings.