Conditions or Reasons for Planning Application - CB/22/00197/DOC
Conditions or Reasons:
26) No development shall commence until a detailed surface water drainage scheme for the site, based on the agreed Flood Risk Assessment and Drainage Strategy (Prepared by Jubb Consulting Engineers, May 2019) and assessment of the hydrological and hydrogeological context of the development and the expected outfall extent, has been submitted to and approved in writing by the Local Planning Authority. The surface water drainage scheme shall be implemented as approved. Any variation to the connections and controls indicated on the approved details which may be necessary at the time of construction would require the resubmission of those details to the Local Planning Authority for approval.

Reason: Details are required prior to commencement to ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with para 163 and 165 of the NPPF and its supporting technical guidance.
27) No building/dwelling shall be occupied until the developer has formally submitted in writing to the Local Planning Authority a finalised 'Maintenance and Management Plan' for the entire surface water drainage system, inclusive of any adoption arrangements and/or private ownership or responsibilities, and that the approved surface water drainage scheme has been correctly and fully installed as per the final approved details.

Reason: To ensure that the implementation and long term operation of a sustainable drainage system (SuDS) is in line with what has been approved, in accordance with Written Statement HCWS161.


Return to Search | Close WindowTop of Page