| Conditions or Reasons for Planning Application - CB/22/00431/DOC |
| Conditions or Reasons: | 1)
All residential caravans together with any structures, equipment and materials brought on to or erected on the land, or works undertaken to it in connection with the siting of the caravans, shall be removed and the land shall be restored to its condition before the development took place within 28 days of the date of failure to meet any one of the requirements set out in (A) to (D) below:
(A) within 3 months of the date of this decision a scheme detailing:
the waste storage facilities to serve the various parts of the site; and a landscaping scheme, clearly identifying details of any tree, hedge and shrub planting including details of species, plant sizes and proposed numbers; and a detailed design of the surface water drainage, to manage surface water run off from the development for up to and including the 1 in 100 year event (+40%CC). The discharge rate from the development will be limited to the equivalent 1 in 1 year rate, or an appropriate rate as agreed by the Bedford Group of Internal Drainage Boards; and the surfacing of the access from the existing carriageway on Dunstable Road and for a minimum of a further 5m into the site (measured from the highways boundary); and demonstrating an adequate foul drainage system is serving the site.
(B) within 11 months of the date of this decision the site development scheme shall have been approved by the Local Planning Authority or, if the Local Planning Authority refuse to approve the scheme, or fail to give a decision within the prescribed period, an appeal shall have been made to, and accepted as validly made by, the Secretary of State;
(C) if an appeal is made in pursuance of (B) above, that appeal shall have been finally determined and the submitted site development scheme shall have been approved by the Secretary of State; and
(D) the approved scheme shall have been carried out and completed in accordance with the approved timetable, or in accordance with any amended details and/or revised timetables as might be agreed from time to time in writing by the Local Planning Authority.
Reason: In order to ensure that the proposal takes account for the need for hard and soft landscaping, that the development has no adverse effect upon general or residential amenity, that the proposal does not result in surface water flooding, results in highway safety problems or has an unacceptable foul drainage provision, all in accordance with Policy BE8 of the South Bedfordshire Local Plan Review and having particular regard to the location of the site in the Green Belt and open countryside in accordance with Sections 12, 13, 14 and 15 of the NPPF. |
2)
At the same time as the site development scheme required by Condition 7 is submitted to the Local Planning Authority there shall be submitted a programme of management and maintenance of the surface water drainage system for the lifetime of the development. The drainage system shall be managed and maintained in accordance with the approved programme.
Reason: In order to ensure that the development has no unacceptable adverse effect upon general or residential amenity in accordance with Policy BE8 of the South Bedfordshire Local Plan Review and having regard to Section 14 of the NPPF. |
3)
At the same time as the site development scheme required by Condition 7 is submitted to the Local Planning Authority there shall be submitted a programme of management and maintenance of the foul water drainage system for the lifetime of the development. The drainage system shall be managed and maintained in accordance with the approved programme.
Reason: In order to ensure that the development has no unacceptable adverse effect upon general or residential amenity in accordance with Policy BE8 of the South Bedfordshire Local Plan Review and having regard to Section 14 of the NPPF. |
|
|---|