| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the existing building.
Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match the existing building in the interests of the visual amenities of the locality. (Section 12, NPPF) |
3)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers: SB- Floor Plans - as proposed (482335) 50C-18.05.2022, Drawing Mark Up-18.05.22, SML851 - Block Plan - 04.03.2022, SML850 2 - Site Location Plan - 04.03.2022, All Plans - 10.02.2022 & Arboricultural Impact Assessment and Method Statement - 22_5837_04_37-18.05.22
Reason: To identify the approved plan/s and to avoid doubt. |
4)
Throughout the course of development, all working practices shall confirm to the working methodology outlined in Section 5 "Method Statement", and Appendix 3 "Tree Protection Plan" (Drawing No. 22_5837_04_37_TPP_V1) of the supporting document "Tree Survey, Arboricultural Impact Assessment and Arboricultural Method Statement" (Ref. 22_5837_04_37) as prepared by ROAVR Environmental.
REASON To ensure that all working practices, and working methodology, conform to the identified requirements of good arboricultural practice, so as to prevent damage to adjacent trees from all development activity. |
5)
Consent is being granted in the recognition that the proposed garden building, decking and hot tub areas will be positioned over an existing hard surfaced concrete slab. If this slab is removed, either in part or whole, during the course of development works, then the recommendations set out in Section 5.7 "Restricted Activity Zone", Section 9.0 "Ground Protection Measures - Detailed Specification", and in accordance with Appendix 3 "Tree Protection Plan" (Drawing No. 22_5837_04_37_TPP_V1) of the supporting document "Tree Survey, Arboricultural Impact Assessment and Arboricultural Method Statement" (Ref. 22_5837_04_37) as prepared by ROAVR Environmental, must be strictly adhered to.
REASON: To ensure that any new excavation work or ground disturbance within the designated Root Protection Area of the Oak tree T1 does not damage the rooting system of this tree. |
|
|---|