<< Back to case
Conditions or Reasons for Planning Application - CB/22/00627/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) The proposed 1.2 metre post and rail fence as shown on plan no. L-11 Rev A shall be implemented in full accordance with the details shown prior to the change of use being brought into use. No other or alternative boundary treatment shall be installed through the provisions of Schedule 2, Part 2, Class A of the Town and Country Planning (General Permitted Development)(England) Order 2015 (as amended), without written approval from the Local Planning Authority.

Reason: To safeguard the appearance of the completed development and the visual amenities of the locality.
(Section 12, NPPF)
3) The existing hedgerow and planting along the northeastern boundary of the site abutting the public highway is to be pruned back and contained within the confines of the application site. The planting should not encroach or overhang the public highway.

Reason: To ensure vehicles entering the public highway can achieve appropriate visibility
(Section 9, NPPF)
4) The proposed new access shall not be brought into use until the junction of the proposed vehicular access within the highway has been constructed in accordance with the approved details shown on drawing number L-11.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
(Section 94, NPPF)
5) Before the new access is brought into use, the existing access will be closed and will cease to be used.

Reason: In the interest of highway safety
(Section 9, NPPF)
6) The development shall not be occupied or brought into use until the parking scheme shown on Drawing No. L-11 has been completed. The scheme shall thereafter be retained for this purpose.

Reason: To ensure provision for car parking clear of the highway.
(Section 94, NPPF)
7) Notwithstanding the provisions of Part 1 Class E of Schedule 2 to the Town and Country (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no buildings or other structures shall be erected or constructed within the curtilage of the property without the grant of further specific planning permission from the Local Planning Authority.

Reason: To control the development in the interests of the visual amenity of the area.
(Section 12, NPPF)
8) The planting and landscaping scheme shown on approved Drawing No. L-11 shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season shall mean the period from October to March). The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season with others of a similar size and species.

Reason: To ensure an acceptable standard of landscaping.
(Sections 12 & 15, NPPF)
9) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers L-11 Rev A and L-10

Reason: To identify the approved plan/s and to avoid doubt.


Return to Search | Close WindowTop of Page