<< Back to case
Conditions or Reasons for Planning Application - CB/22/00894/DOC
Conditions or Reasons:
2) Within 3 months of the date of this permission a landscaping scheme to include all hard and soft landscaping (including boundary treatment) and a scheme for landscape management and maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To ensure an acceptable standard of landscaping.
(Sections 12 & 15, NPPF)
4) Within 3 months of the date of this permission, the parking, and manoeuvring areas as detailed on plan reference GDN_100 rev C, shall be surfaced in stable and durable materials in accordance with details to be approved in writing by the Local Planning Authority. Arrangements shall be made for surface water drainage from the site to soak away within the site so that it does not discharge into the highway or into the main drainage system.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure satisfactory parking of vehicles outside highway limits (T2 CBLP, Chapter 9 NPPF).
10) Within 3 months of the date of this permission a scheme for protecting the proposed residential units from noise from road traffic shall be submitted to and approved in writing by the local planning authority. The scheme shall follow the recommendations identified in the Noise Assessment report (Ref: Version 1.1) dated 18th March 2020. The approved scheme shall be implemented in full accordance with the approved details, and shown to be effective, within 3 months of the scheme being approved and it shall be retained in accordance with those details thereafter.

Reason: To protect the amenity of future occupiers of the development.


Return to Search | Close WindowTop of Page