Conditions or Reasons for Planning Application - CB/22/01104/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) All external works hereby permitted shall be carried out in accordance with the details provided in the application.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with appropriate materials in the interests of the visual amenities of the locality.
(Section 12, NPPF)
3) The extension hereby permitted shall be used as ancillary storage only in conjunction with the use of the existing premises as a single unit.

Reason: To ensure that the Local Planning Authority maintains proper planning control in view of the special circumstances of the site.
(Section 12, NPPF)
4) The surface water drainage shall be constructed to manage surface water runoff (via existing sewer system), from the development for up to and including the 1 in 100+30%CC rainfall event. The final detailed design shall be based on the agreed drawing (Ref: Red Shed Designs, RSD 219, March 2022) and DEFRAs Non-statutory technical standards for sustainable drainage systems (March 2018) and shall be implemented and maintained as approved. Any variation to the connections and controls indicated on the approved drawing which may be necessary at the time of construction would require the resubmission of those details to the Local Planning Authority for approval.

Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with CBC Local policy CC3 to CC5 and NPPF Paras 159 to 169 Inclusive of foot notes 54 to 56 and its supporting technical guidance.
5) Prior to the development hereby approved being bought into use, a scheme to demonstrate that surface water will be contained and controlled within site boundary for the 1 in 100+30% rainfall event shall be submitted to and approved in writing by the Local Planning Authority. The approved details shall be maintained thereafter.

Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with CBC Local policy CC3 to CC5 and NPPF Paras 159 to 169 Inclusive of foot notes 54 to 56 and its supporting technical guidance.
6) The development hereby permitted shall be undertaken in full accordance with the Councils adopted Construction Code of Practice for Developers and Contractors https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.

Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties (Section 12, NPPF)
7) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers: P01A, P02, P03, P04, P05, P06, P07A, P08B.

Reason: To identify the approved plan/s and to avoid doubt.