Conditions or Reasons for Planning Application - CB/22/01248/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of drawing numbers; 300A, 301B.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials in the interests of the visual amenities of the locality.
(Section 12, NPPF)
3) The surface water drainage shall be constructed to manage surface water runoff from the development for up to and including 1 in 100 year event (+40%CC), via discharge to an existing watercourse. The final detailed design shall be based on the agreed FRA and DS (Refs: 23.23.01 RevC, April 2024 and 23.23.02, Feb 2024) and DEFRAs Non-statutory technical standards for sustainable drainage systems (March 2018) and shall be implemented and maintained as approved. Maintenance will ensure the system functions as designed for the lifetime of the development. Any variation to the connections and controls indicated on the approved drawing which may be necessary at the time of construction would require the resubmission of those details to the Local Planning Authority for approval. The discharge rate from the development will be limited to the equivalent 1 in 1 year rate, or an appropriate rate as agreed by the Bedford Group of Internal Drainage Boards.

Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with CBC Local policy CC3 to CC5 and NPPF Paras 159 to 169 Inclusive of foot notes 54 to 56 and its supporting technical guidance.
4) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers; 01, 10A, 50, 51, 60, 100C, 101B, 102B, 300A, 301B.

Reason: To identify the approved plan/s and to avoid doubt.