<< Back to case
Conditions or Reasons for Planning Application - CB/22/01350/DOC
Conditions or Reasons:
10) No development shall commence until a final detailed design of the surface water drainage scheme, to manage surface water runoff from the development for up to and including the 1 in 100-year event (+40%CC), has been submitted to and approved in writing by the Local Planning Authority. The discharge rate from the development to any receiving watercourse or other drain will be limited to the greenfield QBAR rate, or other appropriate rate as agreed by the IDB; details of this shall be provided with the method of connection, condition of the receiving system and the permissions required to facilitate a connection. Details of the proposed construction and long-term maintenance of the surface water drainage system will also be provided.

Reason: To ensure the approved surface water drainage system will function to a satisfactory minimum standard of operation and that the works will prevent the increased risk of flooding both on and off site, and that it will be fully constructed and maintained, in accordance with para 163 of the NPPF and CBCs Local Drainage Byelaws.


Return to Search | Close WindowTop of Page