Conditions or Reasons for Planning Application - CB/22/01366/DOC
Conditions or Reasons:
3) No construction work on the walls and roofs of the development shall take place, notwithstanding the details submitted with the application, until details of the materials to be used for the external roofs and walls of the development hereby approved have been submitted to, and approved in writing by, the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
6) Prior to the commencement of development, an Arboricultural Method Statement relating to the proposed works to the access road at the entrance to the site in close proximity to the existing group Tree Preservation Order shall be submitted to, and approved in writing by, the Local Planning Authority. The development shall be implemented in accordance with the approved Arboricultural Method Statement.
16) The development hereby permitted shall not begin until a scheme to deal with contamination of land/ground gas/controlled waters has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include all of the following measures, unless the Local Planning Authority dispenses with any such requirement specifically in writing:

1) A Phase I site investigation report carried out by a competent person to include a desk study, site walkover, the production of a site conceptual model and a human health and environmental risk assessment, undertaken in accordance with BS 10175:2011 Investigation of Potentially Contaminated Sites Code of Practice.

2) A Phase II intrusive investigation report detailing all investigative works and sampling on site, together with the results of the analysis, undertaken in accordance with BS 10175:2011 Investigation of Potentially Contaminated Sites Code of Practice. The report shall include a detailed quantitative human health and environmental risk assessment.

3) A remediation scheme detailing how the remediation will be undertaken, what methods will be used and what is to be achieved. A clear end point of the remediation shall be stated, and how this will be validated. Any ongoing monitoring shall also be determined.

4) If during the works contamination is encountered which has not previously been identified, then the additional contamination shall be fully assessed in an appropriate remediation scheme which shall be submitted to and approved in writing by the Local Planning Authority.

5) A validation report detailing the proposed remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology shall be submitted prior to first occupation of the development. Details of any post-remedial sampling and analysis to demonstrate that the site has achieved the required clean-up criteria shall be included, together with the necessary documentation detailing what waste materials have been removed from the site.