| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
No development above slab level, notwithstanding the details submitted with the application, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality. (Section 12, NPPF) |
3)
The development hereby permitted shall be undertaken in full accordance with the Councils adopted Environmental Code of Practice https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning/3
Reason: In order to minimise the impact of development on existing trees, landscape features and biodiversity (Section 15, NPPF) |
4)
The development hereby permitted shall be undertaken in full accordance with the Councils adopted Construction Code of Practice for Developers and Contractors https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.
Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties (Section 12, NPPF) |
5)
Prior to the construction of vehicular parking areas associated with the approved dwellings, a scheme for the charging of electric and ultra-low emission vehicles shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall accord with Policy T5 of CBLP and shall include the following:
Details of active charging posts or passive provision such as cabling and electricity supply for each dwelling Timescales / triggers for implementation of the scheme.
The development shall be completed in accordance with these approved details including the agreed timescales / triggers.
Reason: To assist with the transition to low-emission vehicles in line with Policy T5 of the CBLP and paragraph 110 of the National Planning |
6)
No development shall take place above slab level until an Ecological Enhancement Strategy (EES) for the creation of new wildlife features such as hibernacula, the inclusion of integrated bird/bat and bee boxes in buildings/structures, hedgehog holes in fences and tree, hedgerow, shrub and wildflower planting/establishment has been submitted to and approved in writing by the local planning authority. The content shall include the: a) purpose and objectives for the proposed works; b) detailed design(s) and/or working method(s) necessary to achieve stated objectives (including, where relevant, type and source of materials to be used); c) extent and location of proposed works shown on appropriate scale maps and plans; d) timetable for implementation, demonstrating that works are aligned with the proposed phasing of construction; e) persons responsible for implementing the works; f) details of initial aftercare and long-term maintenance.
The works shall be carried out strictly in accordance with the approved details and shall be retained in that manner thereafter.
Reason: To ensure development is ecologically sensitive and secures biodiversity enhancements in accordance with the National Planning Policy Framework. |
7)
Visibility splays shall be provided at all road junctions within the site. The minimum dimensions to provide the required splay lines shall be 2.4m measured along the centre line of the side road from its junction with the channel to the through road and 25m measured from the centre line of the side road along the channel of the through road. The vision splays required shall be provided and defined on the site by or on behalf of the developers and be entirely free of any obstruction.
Reason: To provide adequate visibility at road junction in the interest of road safety. |
8)
No building shall be occupied until cycle storage has been provided and the vehicle parking spaces have been properly surfaced and marked out/provided in accordance with the approved drawing. The spaces shall thereafter be kept available for parking at all times.
Reason: To minimise the potential for on-street parking and thereby safeguard the interest of the safety and convenience of road users. |
9)
Before the premises are occupied all on site vehicular areas shall be surfaced in a stable and durable materials in accordance with details to be approved in writing by the Local Planning Authority. Arrangements shall be made for surface water drainage from the site to soak away within the site so that it does not discharge into the highway or into the main drainage system.
Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure satisfactory parking of vehicles outside highway limits |
10)
Before the development is brought into use, the proposed development shall be carried out and completed in all respects in accordance with the access siting and layout illustrated on the approved plan No. PL-100 Rev G and defined by this permission and, notwithstanding the provision of the Town and Country Planning General Permitted Development Order 1995, (or any Order revoking or re-enacting that Order) there shall be no variation without the prior approval in writing of the Local Planning Authority.
Reason: To ensure that the development of the site is completed insofar as its various parts are interrelated and dependent one upon another and to provide adequate and appropriate access arrangements at all times. |
11)
No above ground development shall take place until a scheme for protecting the proposed dwellings from noise from road traffic and commercial noise has been submitted to and approved in writing by the local planning authority. The scheme shall follow the recommendations identified in the Spectrum Acoustics Noise report (Ref: AP1672/21205/1) dated 06/12/2021. None of the dwellings shall be occupied until such a scheme has been implemented in accordance with the approved details, and shown to be effective, and it shall be retained in accordance with those details thereafter.
Reason: To protect the amenity of future occupiers of the development. |
12)
No above ground building work shall commence until a ventilation strategy for any dwelling needing windows to be closed to achieve the internal noise criteria of BS8233:2014 has been submitted for the approval of the LPA, to suitably protect future occupiers of the new housing from exposure to noise ingress, in conjunction with adequate ventilation and mitigation of overheating. The ventilation strategy should therefore address how: the ventilation strategy impacts on the acoustic conditions the strategy for mitigating overheating impacts on the acoustic condition Where necessary this should include a more detailed overheating assessment to inform this. The strategy shall be compiled by appropriately experienced and competent persons. The approved ventilation strategy shall be implemented prior to first occupation of that phase of development and retained thereafter. Reason: To protect the amenity of future occupiers of the proposed dwellings. |
13)
In the event that contamination is found at any time when carrying out the approved development, it shall be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment shall then be undertaken by a competent person, in accordance with 'Model Procedures for the Management of Land Contamination, CLR 11'. A written report of the findings should be forwarded for approval to the Local Planning Authority. Following completion of remedial measures a verification report shall be prepared that demonstrates the effectiveness of the remediation carried out. No part of the development should be occupied until all remedial and validation works are approved in writing.
Reason: To ensure that no future investigation is required under Part 2A of the Environmental Protection Act 1990. |
14)
No development shall commence until a detailed surface water drainage scheme, to manage surface water runoff from the development for up to and including the 1 in 100 year event (+40%CC), via infiltration through permeable paving, and a maintenance and management plan for the scheme has been submitted to and approved in writing by the Local Planning Authority. The final detailed design shall be based on the agreed FRA & drainage Strategy (Ref: EAS, 3652/2022, Rev B Final, March 2022) and DEFRAs Non-statutory technical standards for sustainable drainage systems (March 2018) and shall be implemented and maintained as approved. Maintenance will ensure the system functions as designed for the lifetime of the development. Any variation to the connections and controls indicated on the approved drawing which may be necessary at the time of construction would require the resubmission of those details to the Local Planning Authority for approval. The discharge rate from the development will be via infiltration.
Reason: Reason; To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with CBC Local policy CC3 to CC5 and NPPF Paras 159 to 169 Inclusive of foot notes 54 to 56 and its supporting technical guidance. |
15)
No building/dwelling shall be occupied until the developer has formally submitted in writing to the Local Planning Authority a finalised 'Maintenance and Management Plan' for the entire surface water drainage system, inclusive of any adoption arrangements and/or private ownership or responsibilities, and that the approved surface water drainage scheme has been correctly and fully installed as per the final approved details.
Reason: To ensure that the implementation and long term operation of a sustainable drainage system (SuDS) is in line with what has been approved, in accordance with Written Statement HCWS161, 18th December 2014. |
16)
Prior to the construction above damp proof course, a scheme for on-site foul water drainage works, including connection point and discharge rate to the public network, shall be submitted to and approved in writing by the Local Planning Authority.
Reason To prevent environmental and amenity problems arising from flooding |
17)
Post-Construction Verification Report demonstrating compliance with Policy CC1 (points 5-10) was achieved prior to occupation of the last dwelling.
Reason: In the interest of sustainability and to reduce the harmful impacts of climate change. |
18)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers PL-100G, T-02 D, PL-001 C, GUHG23584 11A Sheet 1 of 2, GUHG23584 11A Sheet 2 of 2 , GUHG23584 12A Sheet 1 of 2, GUHG23584 12A Sheet 2 of 2, PL-103, PL-102, PL-101.
Reason: To identify the approved plan/s and to avoid doubt. |
19)
No dwelling shall be occupied until a footway has been constructed on the southern side of Biggleswade Road between development access and existing bus stop in accordance with details of the approved drawing/or scheme to be submitted to and approved by the Local Planning Authority. Any Statutory Undertakers equipment or street furniture shall be re-sited to provide an unobstructed footway.
Reason: In the interests of road safety and pedestrian movement to reach westbound public transport services. |
|
|---|