<< Back to case
Conditions or Reasons for Planning Application - CB/22/02041/DOC
Conditions or Reasons:
3) Notwithstanding the details submitted with the application, no development above proposed ground level shall take place until a schedule of all external materials and finishes, including colours expressed as RAL Nos or demonstrated by colour swatches, has been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
4) Samples of external materials, including plinth brick, garden wall brick, rainwater goods, roof tiles and ridges shall be made available on site for inspection and shall be approved in writing by the Local Planning Authority before the relevant material is installed as part of the development. The development shall thereafter be carried out in accordance with the approved details.
5) Notwithstanding the details submitted with the application, all windows, external doors and rooflights shall be installed in accordance with details which have first been submitted to and approved in writing by the Local Planning Authority. These shall include full details of the construction of the windows, glazing and opening arrangements; and shall demonstrate that the first floor window to the rear of the dwelling serving bedroom 2 will be fitted with obscured glazing to substantially restrict vision through it at all times and will be non-opening other than to provide a means of escape in an emergency. The development shall be carried out in accordance with the approved details and shall be retained as such thereafter.
6) No development above proposed ground level shall take place until a landscaping scheme to include details of all hard and soft landscaping works and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme, and any which die or are destroyed within five years following the implementation of the landscaping scheme shall be replaced during the next planting season.
7) Before the development is first occupied, a scheme indicating the positions, design, materials and type of boundary treatment to be erected shall be submitted to and approved in writing by the Local Planning Authority. The boundary treatment shall be completed in accordance with the approved scheme before the development is first occupied, and shall be retained as such thereafter.


Return to Search | Close WindowTop of Page