| Conditions or Reasons for Planning Application - CB/22/03032/DOC |
| Conditions or Reasons: | 3)
No development or demolition shall take place until a written scheme of archaeological investigation; that includes the provision for archaeological fieldwork, post excavation analysis and publication, has been submitted to and approved in writing by the Local Planning Authority. The development hereby approved shall only be implemented in full accordance with the approved archaeological scheme.
Reason: This condition is pre-commencement as a failure to secure appropriate archaeological investigation in advance of development would be contrary to paragraph 199 of the National Planning Policy Framework (NPPF) that requires developers to record and advance of understanding of the significance of any heritage assets to be lost (wholly or in part) as a consequence of the development. |
4)
No development shall commence until a detailed surface water drainage scheme, to manage surface water runoff from the development for up to and including the 1 in 100 year event (+40%CC), and a maintenance and management plan for the scheme has been submitted to and approved in writing by the Local Planning Authority. The discharge rate from the development will be limited to an appropriate rate as agreed by the sewerage undertaker. The final detailed design shall be based on the agreed drainage Strategy (to be submitted) and DEFRAs Non-statutory technical standards for sustainable drainage systems (March 2018) and shall be implemented and maintained as approved. Maintenance will ensure the system functions as designed for the lifetime of the development. Any variation to the connections and controls indicated on the approved drawing which may be necessary at the time of construction would require the resubmission of those details to the Local Planning Authority for approval. Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with para 163 and 165 of the NPPF and its supporting technical guidance. |
14)
Prior to the commencement of the development, a detailed Construction Management Plan (CMP) shall be submitted to and approved in writing by the Local Planning Authority, and the plan shall include the following:
The construction programme and phasing Hours of operation, delivery and storage of materials Details of any highway works necessary to enable construction to take place Parking and loading arrangements Details of hoarding Management of traffic to reduce congestion Control of dust and dirt on the public highway Details of consultation and complaint management with local businesses and neighbours Waste management proposals Mechanisms to deal with environmental impacts such as noise and vibration, air quality and dust, light and odour. Details of any proposed piling operations, including justification for the proposed piling strategy, a vibration impact assessment and proposed control and mitigation measures. All works shall be carried out in accordance with the approved CMP thereafter. Reason: In the interests of highway safety and the control of environmental impactsThe applicant is advised that while the Council has no reason to believe this site is contaminated, and is not aware of any potentially contaminative past use, it is the developer's responsibility to ensure that final ground conditions are fit for the end use of the site. If during any site investigation, excavation, engineering or construction works evidence of land contamination is identified, the applicant shall notify the Local Planning Authority without delay. Any land contamination identified shall be remediated to the satisfaction of the Local Planning Authority to ensure that the site is made suitable for its end use. |
|
|---|